Laserfiche WebLink
Final Initial Studv and Mitiaated Neaative Declaration <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Monitoring <br />Implementation <br />Responsibility for <br />Outside <br />Mitigation Measure <br />Activity/Timing/ <br />Responsibility/ <br />Oversight of <br />Compliance/Coordination <br />Agency <br />Comments <br />Frequency <br />Verification <br />Verification <br />Activity: <br />Qualified <br />City of Santa Ana <br />Orange <br />CUL-2: Unanticipated discoveries. If <br />Archaeological <br />Archaeologist <br />County <br />subsurface deposits believed to be <br />evaluation of <br />Coroner <br />cultural or human in origin are <br />potential cultural <br />discovered during construction, all <br />work must halt within a 100-foot <br />resources. <br />Native <br />American <br />radius of the discovery. A qualified <br />Timing: <br />Heritage <br />Initials <br />Initials <br />professional archaeologist, meeting <br />During <br />Commission <br />the Secretary of the Interior's <br />Professional Qualification Standards <br />construction. <br />Native <br />for prehistoric and historic <br />Frequency: <br />American <br />archaeology, shall be retained to <br />As necessary <br />Most Likely <br />evaluate the significance of the find, <br />Date <br />Date <br />and shall have the authority to modify <br />during <br />Descendant <br />the no -work radius as appropriate, <br />construction. <br />(MLD) <br />using professional judgment. The <br />following notifications shall apply, <br />depending on the nature of the find: <br />If the professional archaeologist <br />determines that the find does not <br />represent a cultural resource, work <br />may resume immediately and no <br />agency notifications are required. <br />Mitigation Monitoring and Reporting Plan 5-6 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />