Laserfiche WebLink
Final Initial Studv and Mitiaated Neaative Declaration <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Monitoring <br />Implementation <br />Responsibility for <br />Oversight of <br />Outside <br />Mitigation Measure <br />Activity/Timing/ <br />Responsibility/ <br />Compliance/Coordination <br />Agency <br />Comments <br />Frequency <br />Verification <br />Verification <br />penalties and repercussions for non- <br />compliance with the program. <br />The training shall be prepared by a <br />qualified professional archaeologist <br />and may be provided eitherthrough a <br />brochure, video, or in -person tailgate <br />meeting, as determined appropriate <br />by the archaeologist. The training <br />shall be provided to all construction <br />supervisors, forepersons, and <br />operators of ground -disturbing <br />equipment. All personnel shall be <br />required to sign a training roster. The <br />construction manager is responsible <br />for ensuring that all required <br />personnel receive the training. The <br />Construction Manager shall provide a <br />copy of the signed training roster to <br />the City as proof of compliance. <br />Mitigation Monitoring and Reporting Plan 5-5 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />