Laserfiche WebLink
Plans, Program and Policies. <br />PPP GEC#-1: CBC Compliance. The proposed Project is required to comply with the California <br />Building Standards Code (CBC) as included in the City's Municipal Code as Chapter 8, Article 2, <br />Division I. to preclude significant adverse effects associated with seismic and soils hazards. As part <br />of CBC compliance, CBC related and geologist and,/or civil engineer specifications for the proposed <br />Project shall be incorporated into grading plans and building specifications as a condition of <br />construction permit approval. <br />Impact Finding: The Project would not expose people or structures to potential substantial adverse <br />effects, including the risk of loss, injury, or death involving seismic -related ground failure, including <br />liquefaction (Draft Supplemental EIR at p. 5.4-10). <br />Facts in Support of Findings: The Geotechnical Report (included as Appendix G to the Draft <br />Supplemental EIR) identified that onsite soils consist of clayey soils that exist to a depth of <br />approximately 30 feet bgs. Underlying soils include dense to very dense silty sand, poorly -graded <br />sands, and lean clays. The highest historic groundwater on the Project site was encountered at <br />approximately 5 feet bgs. Groundwater was encountered within onsite borings at depths between <br />12 feet and 16 feet bgs. However, due to the nature of the soils in the upper 50 feet, the <br />Geotechnical Report determined that the liquefaction potential is considered low. Structures built in <br />the City are required to be built in compliance with the CBC, as included in the City's Municipal <br />Code as Chapter 8, Article 2, Division 1 (and in the Draft Supplemental EIR as PPP GEQ-1 ), which <br />regulates all building and construction projects within the City and implements a minimum standard <br />for building design and construction that includes specific requirements for seismic safety, <br />excavation, foundations, retaining walls and site demolition. <br />The Geotechnical Report prepared for the Project site provides CBC seismic design criteria that are <br />specific to the onsite soils and the potential liquefaction and settlement. Compliance with the CBC, <br />as included as PPP GEO-1, would require proper construction of building footings and foundations <br />so that it would withstand the effects of potential ground movement, including liquefaction and <br />settlement. The CBC, as currently adopted in the City's Municipal Code Chapter 8, Article 2, Division <br />I. includes provisions to reduce impacts caused by potential major structural failures or loss of life <br />resulting from geologic hazards. The City requires the Project specific engineering design <br />recommendations be incorporated into grading plans and building specifications as a condition of <br />construction permit approval. Therefore, the development of the proposed Project would be <br />required to conform to the seismic design parameters of the CBC, as included as PPP GEC-1, would <br />reduce hazards from seismic -related ground failure, including liquefaction and settlement to a less <br />than significant level (Draft Supplemental EIR at p. 5.4-10). <br />Plans, Program and Policies: <br />PPP GEo-1: CBC Compliance. As listed previously. <br />Impact Finding: The Project would not result in substantial soil erosion or the loss of topsoil (Draft <br />Supplemental EIR at p. 5.4-1 1). <br />