Laserfiche WebLink
existing impacted traffic signal poles and replace with new traffic signal <br />poles to standard. Install new City approved controller and cabinet. Install <br />video detection camera system for entire intersection. Install APS for <br />entire intersection. Install new CCTV camera per City specifications and <br />any associated appurtenances as conceptually illustrated in Exhibit C, <br />attached. <br />d. MacArthur Boulevard at Plaza Drive. Modify existing traffic signal to <br />accommodate the intersection improvements. Remove and salvage <br />existing impacted traffic signal poles and replace with new traffic signal <br />poles to standard. Install new City approved controller and cabinet. Install <br />video detection camera system for entire intersection. Install APS for <br />entire intersection. Install new CCTV camera per City specifications and <br />any associated appurtenances as conceptually illustrated in Exhibit D, <br />attached. <br />e. Plaza Drive at Callens Common. Install new traffic signal including traffic <br />signal poles, controller cabinet, meter pedestal, conduit, wiring, video <br />detection system, APS, CCTV camera per City specifications, emergency <br />vehicle preemption, signage, and fiber optic communication system to <br />connect to City of Santa Ana traffic signal network and any associated <br />appurtenances as conceptually illustrated in Exhibit E, attached. <br />f. Bristol Street at Existing Driveway. Install new traffic signal including <br />traffic signal poles, controller cabinet, meter pedestal, conduit, wiring, <br />video detection system, APS, CCTV camera per City specifications, <br />emergency vehicle preemption, signage, and fiber optic communication <br />system to connect to City of Santa Ana traffic signal network and any <br />associated appurtenances as conceptually illustrated in Exhibit F, <br />attached. <br />g. Sunflower Avenue at Proposed Driveway. Subject to the <br />improvements/realignment of South Coast Plaza driveway and the <br />coordination with the City of Costa Mesa, install new traffic signal <br />including traffic signal poles, controller cabinet, meter pedestal, conduit, <br />wiring, video detection system, APS, CCTV camera per City <br />specifications, emergency vehicle preemption, signage, and fiber optic <br />communication system to connect to City of Santa Ana traffic signal <br />network and any associated appurtenances as conceptually illustrated in <br />; n of the approved traffic study. Modified by City <br />Exhibit G <br />Council during October 1, 2024 meeting. <br />14. Timing of Improvements and Project Phasing_The Development is proposed to <br />be constructed in 3 consecutive phases as shown on Figure 6-2 (Conceptual <br />Phasing Plan) of the Specific Plan. Construction and completion of all public <br />improvements described shall commence and be completed in a phased manner <br />to correspond to the phasing of the Project as follows: <br />a. Phase I — Southerly half of project (south of proposed Callens Common). <br />i. Prior to issuance of building permit for the first Implementing <br />Project on Phase I, Owner shall: <br />Resolution No. 2024-055 <br />Page 10 of 27 <br />