My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-055 - City of Santa Ana Approving Vesting Tentative Tract Map No. 2023-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-055 - City of Santa Ana Approving Vesting Tentative Tract Map No. 2023-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 4:38:49 PM
Creation date
10/9/2024 10:41:46 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Doc #
2024-055
Item #
26
Date
10/1/2024
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
phasing of the public street improvements. <br />Owner shall complete full depth street trench restoration with all utility trench <br />work per standard plans or approved street improvement plans. <br />Owner shall apply slurry seal with REAS Type 11 slurry along the project's <br />frontage to mitigate roadway damages due to construction and repair any major <br />street defects twice during project buildout. Additionally, Owner shall perform full <br />depth street restoration from the new curb and gutter to the edge of the first <br />vehicle lane line (to fully include the vehicle lane closest to curb) along the <br />project frontage and perform a 3" grind and overlay of the following street limits <br />(inclusive of all intersections): <br />a. Bristol Street: Southbound lanes between MacArthur Boulevard and <br />Sunflower Avenue <br />b. Sunflower Avenue: Westbound lanes between Bristol Street and westerly <br />property boundary <br />c. MacArthur Boulevard: Eastbound lanes between Plaza Drive and Bristol <br />Street <br />d. Plaza Drive: Northbound lanes immediately along Project frontage <br />Timing of improvements shall be as described in condition titled "Timing of <br />Improvements and Project Phasing" below. <br />13. New and Modified Traffic Signals. Owner shall construct or modify traffic signals <br />immediately surrounding the project boundaries, at their sole expense, as <br />follows: <br />a. Bristol Street at MacArthur Boulevard. Modify existing traffic signal to <br />accommodate the intersection improvements. Remove and salvage <br />existing impacted traffic signal poles and replace with new traffic signal <br />poles to standard. Install new City approved controller and cabinet. Install <br />video detection camera system for entire intersection. Install accessible <br />pedestrian system ("APS") for entire intersection. Install new CCTV <br />camera per City specifications and any associated appurtenances as <br />conceptually illustrated in Exhibit A, attached. <br />b. Bristol Street at Callens Common. Modify existing traffic signal to <br />accommodate the intersection improvements. Remove and salvage <br />existing impacted traffic signal poles and replace with new traffic signal <br />poles to standard. Install new City approved controller and cabinet. Install <br />video detection camera system for entire intersection. Install APS for <br />entire intersection. Install new CCTV camera per City specifications and <br />any associated appurtenances as conceptually illustrated in Exhibit B, <br />attached. <br />c. Bristol Street at Sunflower Avenue. Modify existing traffic signal to <br />accommodate the intersection improvements. Remove and salvage <br />Resolution No. 2024-055 <br />Page 9 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.