My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GOLDEN WEST FENCE
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GOLDEN WEST FENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 4:09:10 PM
Creation date
10/10/2024 4:09:10 PM
Metadata
Fields
Template:
Contracts
Company Name
GOLDEN WEST FENCE
Contract #
P 22-1418
Agency
Public Works
Insurance Exp Date
12/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN TA ANA <br />PROPOSAL <br />PROJECT NO.: 22-1418 <br />STORMWATER CHANNEL FENCING UPGRADES PHASE III <br />BIRD PRQPQSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: GOLDEN WEST FENCE <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Remove and Salvage existing chain link <br />380 <br />LF <br />$ 19.29 <br />$ 7,334.20 <br />fence, posts and foundations, complete <br />2 <br />Remove and Salvage existing barricade, <br />20 <br />LF <br />$ 155.37 <br />$ 3,107.40 <br />posts and foundations, complete <br />3 <br />Remove and Salvage existing cable post <br />490 <br />LF <br />$ 15.18 <br />$ 7,438.20 <br />fence, posts and foundations, complete <br />Furnish and Install, complete, 8-Foot <br />4 <br />High Securifor 4D fence and concrete <br />727 <br />LF <br />$ 190.61 <br />$ 138,573A7 <br />foundation per plan <br />Furnish and Install, complete, 8-Foot <br />S <br />High Securifor 4D fence with U-Shaped <br />30 <br />LF <br />$ 551.41 <br />$ 16,542.30 <br />Bracketper Ian <br />Furnish and Install Complete 8-Foot <br />6 <br />High by 6-Foot Wide Securifor 4D <br />2 <br />EA <br />$ 6,382.45 <br />$ 12,764.90 <br />sit%leswing ate er Ian <br />Furnish and Install Complete 8-Foot <br />7 <br />High by 6-Foot Wide Securifor 4D <br />I <br />EA <br />$11,1A19,27 <br />$11,019.27 <br />double swing ate per plan <br />Furnish and Install Complete 8-Foot <br />8 <br />High by 12-Foot Wide Securifor 4D <br />I <br />EA <br />$ 12,042.02 <br />$ 12,042,02 <br />single swing ate per plan <br />9 <br />Remove & Reinstall Existing County <br />6 <br />EA <br />$1,177.10 <br />$ 7,062.60 <br />Sign On Fence <br />10 <br />Remove & Relocate Existing Stop Sign <br />I <br />EA <br />$ 3,636.95 <br />$ 3,636.95 <br />Vandalism - Maintenance Period (90 <br />I 1 <br />Calendar Days) <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />P-1 ofP-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.