My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GOLDEN WEST FENCE
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GOLDEN WEST FENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 4:09:10 PM
Creation date
10/10/2024 4:09:10 PM
Metadata
Fields
Template:
Contracts
Company Name
GOLDEN WEST FENCE
Contract #
P 22-1418
Agency
Public Works
Insurance Exp Date
12/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-141.8 <br />STORMWATER CHANNEL FENCING UPGRADES PHASE III <br />Item <br />Description <br />QtJ <br />UnitF$236,409.31 <br />Amount <br />12 <br />Construction Permit <br />1 <br />LS$ <br />6,042.00 <br />13 <br />Project Sign <br />I <br />LS$ <br />850.00 <br />TOTAL BASE <br />BID ALTERNATES <br />i <br />JAC Pathway 2" Overlay <br />$ 4t41,673.00 <br />$ 41,673.10 <br />TALTERNAETE <br />TOTAL ADDBID <br />TOTAL BASE BID + ADD ALTERNATE BID <br />$ 2-78,082.31 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add-altemate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND I IOUiDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within Ninety (90) working days after the commencement date stated in the Notice to <br />Proceed. The first Thirty (30) working days of which is for construction, and the last Sixty (60) <br />working days for the vandalism -maintenance period. Upon issuance of the Notice to Proceed, <br />Contractor shall immediately place order for long -lead time items (i.e. SECURIFOR 4D <br />FENCING, ALL GATES, ETC.). <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1,490 per calendar day. <br />P-2 of P-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.