My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 2:21:31 PM
Creation date
10/15/2024 11:19:23 AM
Metadata
Fields
Template:
Contracts
Company Name
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Contract #
P13-6792, P15-6445
Agency
Public Works
Council Approval Date
9/17/2024
Expiration Date
1/1/1900
Insurance Exp Date
4/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> Project Number Project No. 13-6792—Bristol Street Improvements Phase 3A Water Change Order Number <br /> Main Improvements <br /> To Los Angeles Engineering, Inc. Contractor <br /> You are hereby directed to male the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract, <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER, <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> JUSTIFICATION <br /> 1. Demolition of the existing wall, including footing, secure residence with temp fence, green <br /> screen, and demolition of 8 trees per PCO#2 dated March 14,2025 <br /> AGREED COST: $11,887.70 <br /> 2. Install of wall notch to provide a 3' clearance around the edge of SCE poles per PCO#4 dated <br /> June 11, 2025. <br /> AGREED COST: $36,562.40 <br /> 3. The 328 LF of over the existing wall footing. This price includes the place of slurry backfill, <br /> pouring larger footing, steel, concrete, solid grout of masonry wall, cutting of block wall, building <br /> paper, and rebar cages per PCO #5 dated June 11, 2025. <br /> AGREED COST: $72,349.43 <br /> 4. Adjustment of sprinkler heads from 4" to 12". Including an increase in sprinkler head lengths <br /> and excavation per PCO #6 dated June 11, 2025. <br /> AGREED COST: $10,582.38 <br /> 5. Extension of fencing to continue to the handrail and 20 LF behind the Bus Shelter per PCO #7 <br /> dated April 30, 2025. <br /> AGREED COST: $6,928.05 <br /> 6. Install of 350 LF of fencing to the chain link fence including forty(40) 8-foot steel posts, and 12 <br /> vertical bars for the chain link fence panel per PCO #8 dated June 9,2025. <br /> AGREED COST: $5,108.16 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.