Laserfiche WebLink
7. Install of irrigation along Bristol & 1011 street not included in the original scope of work per PCO <br /> #014 dated July 15, 2025. <br /> AGREED COST: $22,983.36 <br /> 8. Install of K-Rail including 36 units of a 32 in x 18 in x 72 in water filled barrier wall per PCO #15 <br /> dated August 18, 2025. <br /> AGREED COST: $22,051.13 <br /> TOTAL AGREED COST: $188,452.61 <br /> Page 2of3 <br />