My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLUEVIOLET NETWORKS
Clerk
>
Contracts / Agreements
>
B
>
BLUEVIOLET NETWORKS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 2:39:06 PM
Creation date
11/4/2024 2:38:56 PM
Metadata
Fields
Template:
Contracts
Company Name
BLUEVIOLET NETWORKS
Contract #
A-2024-160
Agency
Public Works
Council Approval Date
10/1/2024
Expiration Date
9/30/2027
Insurance Exp Date
6/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b l ueviDlet <br /> NETWORKS <br /> A DiViSION OF THE COOKS.BOARDMAN GROUP, LLC <br /> Proposal#P-9586 <br /> Project Details <br /> Job Details <br /> AMAG Software <br /> Blueviolet/Blueviolet/Lanmor Services will utilizing the existing instance of the AMAG Symmetry software on the client <br /> supplied and configured virtual server. Blueviolet/Lanmor Services will require remote access to this system during the <br /> installation phase of the project. Blueviolet/Lanmor Services would request ongoing remote access to best handle <br /> support issues after the initial project installation. This can be managed by the City's IT department. <br /> Blueviolet/Lanmor Services will install One AMAG client on a City provided computer at the Library facility. The AMAG <br /> software client will be supplied by others. <br /> Site Locations <br /> The following locations are being converted to the new AMAG access control system: <br /> - City of Santa Ana Library <br /> See the attached project door schedule for details on each reader location. It is the responsibility of the contract and <br /> electrical sub contractor to provide details of the AMAG door controllers, card reader, duress buttons and door release <br /> devices. If this is not provided, Lanmor Service will provide a change order for additional time to identify these areas and <br /> confirm locations based on construction drawings and be billed as time and materials. <br /> Door Controllers <br /> Blueviolet/Lanmor Services will be programming the new AMAG Door controllers. Lanmor service will follow the naming <br /> schemes currently in place with the City of Santa Ana at the City Hall locations. <br /> Elevator Controllers <br /> Blueviolet/Lanmor Services will be programming elevator controllers for the elevator bank. Blueviolet/Lanmor Services <br /> will handle the controller programming and setup, which will be confirmed by a walk with the elevator company, Risk <br /> Management and Building Facilities and IT department. <br /> Elevator controller Exclusions/Elevator Company, Contractor and Electrical Sub Contractor responsibilities: <br /> - Elevator company to supply wire and wire run /conduit to the elevator controller. This connection will require a <br /> pair of wires per floor being controlled by the elevator controller. <br /> - Elevator company to provide the wires from the elevator cab via the traveler path to the cab. Blueviolet/Lanmor <br /> Services will need the following to each of the elevator cabs: <br /> O 2 Pair Non-Shielded <br /> O 1 Pair Shielded <br /> - Elevator company to provide location for the mounting of the card reader in each cab. <br /> - Elevator company to provide technician support during the initial installation process and the commissioning <br /> process of the system. <br /> - If elevator personnel are not available for the required onsite time, Blueviolet/Lanmor Services will provide a <br /> change order to handle additional labor and travel time. <br /> - All wiring and connections are to be in place prior to the configuration and programming of the AMAG elevator <br /> control panel. <br /> If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a <br /> change order to handle the additional work. This will be handled with a change order at time and materials billing. <br /> The human connection between you and your technology. <br /> 17815 Newhope Street, Suite M Fountain Valley, CA 92708 www.bluevioletnetworks.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.