My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECORP CONSULTING, INC. (4)
Clerk
>
Contracts / Agreements
>
E
>
ECORP CONSULTING, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 1:31:32 PM
Creation date
11/5/2024 1:31:21 PM
Metadata
Fields
Template:
Contracts
Company Name
ECORP CONSULTING, INC.
Contract #
A-2023-194-12B
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
2/28/2025
Insurance Exp Date
7/1/2025
Notes
SIDE LETTER 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for CEQA Services Associated with McFadden and Fairview Development Project (2022-37-RFP) <br />Levels will be presented in a tabular format. ECORP will require the completed Traffic Impact <br />Assessment containing local roadway traffic counts to complete the evaluation of offsite traffic noise. <br />ECORP proposes to evaluate noise impacts in a technical report. Where appropriate, the analysis <br />would be supported by modeling documentation, which would be included as an appendix to the <br />report. <br />ECORP will complete the Noise Impact Assessment within 3 to 6 weeks of receiving a notice -to - <br />proceed and all needed documentation such as a traffic study and a finalized Project Description and <br />Site Plan. <br />Task 4 Deliverables: <br />One (1) electronic version of the Noise Impact Assessment Technical Report. <br />PROPOSED SCHEDULE/TIMELINE <br />ECORP proposes the following timeframe for completion of each technical report. <br />Table 1 — Proposed Schedule <br />COST PROPOSAL <br />The cost will be billed on a Time -and -Materials basis. The cost estimates to complete the work <br />are presented in the following table. <br />Table 2 — Cost Estimate <br />* Task 1, Project Management and Coordination is part of the total cost. There are no <br />separate additional costs associated with this Task. <br />Costing Assumptions <br />The cost proposal is presented on a Time -and -Materials basis in accordance with Agreement <br />No. A-2023-194-12 entered into by ECORP Consulting, Inc. and the City of Santa Ana, dated <br />November 7, 2023. <br />ECORP Consulting, Inc. October 2024 4 <br />ENVIRONMENTAL CONSULTANTS P23-481.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.