Laserfiche WebLink
2456781" BELOWTOP OF HEADFLASHING1" MIN PASTBASE SILLFLASHINGSILL FLASHING:12" WIDE NOF - EXTEND12" BEYOND R.O. EA.SIDE - FASTEN AT TOPEDGE ALONG R.O.BASE JAMBFLASHING:9" WIDE NOFSEALANT:CONT. 3/8" BEAD OFSEALANT ON BACKSIDEOF WINDOW FLANGE(PLACE SEALANT ONOUTBOARD EDGE OFFLANGE OR ALONGPREPUNCED HOLES9BASE HEAD FLASHING:12" WIDE SAF - EXTEND 1"BEYOND JAMB FLASHINGSILL WRAP:9" WIDE SAF 40 MILCOMPLETLY COVERR.O. SILL AND SHIELDSAND 3" MIN DOWNLEGINSTALL WINDOWJAMB FLASHING:6" WIDE SAF OVER WINDOWFLANGE AND BASE JAMBFLASHINGNOTE: DETAIL BASED ON FORTIFIBER'SHIGH PERFORMANCE WINDOW FLASHINGSYSTEM W/ SILL CORNERS -SEE MANUF. INSTALLATION GUIDELINES FORMORE DETAILED INFO.3SILL CORNERS W/SEALANT PER MANUF.GUIDELINES(MOISTOP CORNERSHIELD)3" BEYONDTHE WINDOW FLANGETOP AND BOTTOM1MIN 12" WIDE SOLID BACKING ALLFOUR SIDES OF ALL OPENINGSPREPARE SUBSTRATE PERFLASHING AND SUBSTRATEMANUFACTURER'S INSTRUCTIONSSHEATHING MAY OCCUR3-COAT STUCCO SYSTEMO/ METAL LATH O/ WRBDRIP FLASHING - EXTENDCLOSED ENDS 1" PAST WINDOWFRAME EA. SIDESTUD WALLSLSTUD WALL3-COAT STUCCO SYSTEM O/METAL LATH O/ WRB3-COAT STUCCO SYSTEM O/METAL LATH O/ WRBSTUD WALLAPPLIED FOAM TRIMSEE EXT. ELEVATIONSAPPLIED FOAM TRIMSEE EXT. ELEVATIONSAPPLIED FOAM TRIMSEE EXT. ELEVATIONSSL1 : 21 : 2APPLY LOW EXPANSION FOAM ALLFOUR SIDES OF WINDOWBOND BREAKER AT STUCCO TO DRIPFLASHING1110GSM DRIP FLASHING W/ CLOSEDENDS (SOLDER SEAMS)12PROVIDE WRB PER CODEHEAD FLASHING:12" WIDE SAF O/DRIP FLASHING4"FACTORY FINISHED WNDW -SEE WINDOW FLASHINGDETAIL5-6"FACTORY FINISHED WNDW -SEE WINDOW FLASHINGDETAIL5-FACTORY FINISHED WNDW -SEE WINDOW FLASHINGDETAIL5-WRBWEATHER RESISTIVE BARRIERFORTIFIBER 60 MINUTE SUPER JUMBO TEXSELF ADHERED FLASHINGFORTIFIBER FORTIFLASH 25 MIL U.N.O.SAFNOFNAIL ON FLASHINGFORTIFIBER MOISTOP NEXTSEALANTFORTIFIBER MOISTOP SEALANTGENERAL NOTES1.VERIFY WINDOW INSTALLATION WITH WINDOW MANUFACTURER'S WRITTEN INSTRUCTIONS.PROVIDE FIELD MOCKUP OF WINDOW INSTALLATION FOR APPROVAL BY OWNER.2.UNLESS SUPERSEDED BY WINDOW MANUFACTURER, THE ROUGH OPENING SHOULD BE 1/2"GREATER IN WIDTH AND HEIGHT THAN THE NET FRAME SIZE OF THE WINDOW.3.VERIFY ROUGH OPENING IS SQUARE, PLUMB, AND LEVEL. WINDOW SILL TO BE SET UPON LEVELFRAMING SILL WITH CONTINUOUS SUPPORT.4.SUBSTRATES SHALL BE CLEAN , DRY, PRIMED AS REQUIRED, AND UNIFORM/SMOOTH PRIOR TOFLASHING APPLICATION.5.WANED LUMBER WILL NOT BE USED @ ROUGH OPENINGS LOCATIONS.6.FIELD VERIFY ALL DIMENSIONS PRIOR TO CUTTING AND INSTALLING FLASHING COMPONENTS.VERIFY MANUFACTURER REQUIREMENTS.7.PROVIDE MINIMUM 12" SOLID WOOD BACKING OR SHEATHING AT ALL SIDES OF OPENING TOSECURE FLASHING.8.ADHERE SELF ADHERED FLASHING TO CLEAN DUST FREE BACKING TYPICAL.9.USE CHEMICALLY COMPATIBLE PRIMERS, WRB, AND SEALANT WITH THE ADHESIVE SIDE OF THESELF-ADHERED FLASHING AS REQUIRED BY MANUFACTURER.10.NAILS TO BE NO MORE THAN 16" ON CENTER OR AS REQUIRED BY MANUF.11.NO NAILS SHALL BE BENT OVER THE NAILING FIN TO SECURE WINDOWLEGENDWRB BOND BREAKER SHEET O/SAF O/ NOFSHEATHING AS OCCURSFIBER CEMENT SIDING O/ WRB -INSTALL PER MANUF. GUIDELINESSTUD WALLAPPLY LOW EXPANSION FOAM ALL FOURSIDES OF WINDOWBACKER ROD AND SEALANTGAP PER SIDING MANUF. -DO NOT CAULKDRIP FLASHING O/ HARDIE TRIMFACTORY FINISHED WNDW - SEE WINDOWFLASHING DETAIL5-FIBER CEMENT SIDING AND TRIM O/WRB - INSTALL PER MANUF.GUIDELINES - SEE EXT. ELEV. FORMORE INFO.BACKER ROD AND SEALANTSHEATHING AS OCCURSSTUD WALLINTERIOR FINISHFACTORY FINISHED WNDW -SEE WINDOW FLASHINGDETAIL5-SHEATHING AS OCCURSFIBER CEMENT SIDING AND TRIM O/WRB - INSTALL PER MANUF.GUIDELINES - SEE EXT. ELEV. FORMORE INFO.BACKER ROD AND SEALANTSTUD WALLFACTORY FINISHED WNDW -SEE WINDOW FLASHINGDETAIL5-ADDITIONAL LAYER OF GYP. BD.OCCURS AT EXT. BEARING WALLS.SEE FIRE PROTECTION PLANSHEETS A0-11 THRU A0-25ADDITIONAL LAYER OF GYP. BD.OCCURS AT EXT. BEARING WALLS.SEE FIRE PROTECTION PLANSHEETS A0-11 THRU A0-25ADDITIONAL LAYER OF GYP. BD.OCCURS AT EXT. BEARING WALLS.SEE FIRE PROTECTION PLANSHEETS A0-11 THRU A0-25ADDITIONAL LAYER OF GYP. BD.OCCURS AT EXT. BEARING WALLS.SEE FIRE PROTECTION PLANSHEETS A0-11 THRU A0-25ADDITIONAL LAYER OF GYP. BD.OCCURS AT EXT. BEARING WALLS.SEE FIRE PROTECTION PLANSHEETS A0-11 THRU A0-25ADDITIONAL LAYER OF GYP. BD.OCCURS AT EXT. BEARING WALLS.SEE FIRE PROTECTION PLANSHEETS A0-11 THRU A0-25WINDOW DETAILS(FLUSH CONDITION)AD-532113WINDOW FLASHING5WINDOW HEAD (STUCCO)2-6WINDOW HEAD (VERT SIDING)10-14---WINDOW SILL (VERT SIDING)1211WINDOW JAMB (VERT SIDING)15-78WINDOW SILL (STUCCO)43WINDOW JAMB (STUCCO)16181920222324---17------CCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM A06-21-23