My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIKE PRLICH AND SONS, INC. (5)
Clerk
>
Contracts / Agreements
>
M
>
MIKE PRLICH AND SONS, INC. (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 3:30:25 PM
Creation date
11/26/2024 3:27:33 PM
Metadata
Fields
Template:
Contracts
Company Name
MIKE PRLICH AND SONS, INC.
Contract #
A-2024-165-01
Agency
Public Works
Council Approval Date
10/15/2024
Expiration Date
10/14/2027
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> meter vault and replacing it with a new vault. In the event field conditions require, the installation <br /> of water meter vaults and decks shall be as specified in City Standard Plan No. 1403D. All vaults <br /> shall be recessed flush with existing pavement to avoid tripping hazards. It is the contractor's <br /> responsibility to provide alternatives to the project manager. <br /> It shall be the Contractor's responsibility to mobilize, deliver all materials to site, provide traffic <br /> control per the WATCH manual, restore and cleanup site, and provide any incidentals required <br /> to complete the work in place. <br /> All water service turn offs shall be coordinated with the City and the affected resident. The <br /> Contractor shall notify property owner/tenants to be affected, a minimum of 72 hours in advance <br /> of work being performed. Under no circumstances shall a customer be without water <br /> service for more than 4 hours. <br /> CONTRACTOR RESPONSIBILITIES <br /> The Contractor shall provide all labor, materials, services, and equipment necessary for the <br /> completion of the work entailed as specified by the project manager, standard plans and project <br /> specifications detailed herein. All work shall be in accordance with applicable trade practices, <br /> workmanship, meet warranties and shall conform to all applicable laws, codes and regulations. <br /> All work that cannot be completed within one day shall be steel plated and safe for pedestrian <br /> or vehicular traffic. If the vault is located within a vehicle travel lane, the steel plate shall be <br /> recessed to street grade. <br /> Business hours are considered from 7:00 A.M. to 5:00 P.M. (Monday through Friday). Any time <br /> outside of business hours of operation may be considered after hours/weekends. The Contractor <br /> shall provide all necessary traffic control and obtain permits as necessary. <br /> All work will be scheduled upon confirmation of scope and cost and completed within the time <br /> agreed upon for each specific item of work. The Contractor may not begin work before receiving <br /> a written Notice to Proceed by the City's Project Manager. All services, equipment and materials <br /> provided by the Contractor must be in accordance with all applicable Federal, State and local <br /> regulations, laws, and codes. <br /> CITY REPONSIBILITIES <br /> The City will provide access to the information in its possession and systems/software platforms <br /> relevant to the preparation of the required information in the RFP. The City will provide smart <br /> meters and antennas required for each location. In addition, the City will conduct field survey <br /> with the Contractor and provide available as-built/record information. Selected contractors are <br /> expected to perform a substantial review of the project's schedule and milestones to-date, and <br /> be familiar with all software platforms and data sources being utilized. <br /> FEE PROPOSAL <br /> In addition to Section III.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be <br />
The URL can be used to link to this page
Your browser does not support the video tag.