My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BRIDGEROCK CONSTRUCTION, INC. (EL SALVADOR PARK RESTROOM IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BRIDGEROCK CONSTRUCTION, INC. (EL SALVADOR PARK RESTROOM IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 10:38:23 AM
Creation date
12/12/2024 10:37:54 AM
Metadata
Fields
Template:
Contracts
Company Name
BRIDGEROCK CONSTRUCTION, INC.
Contract #
P23-6035, 22-1416
Agency
Public Works
Expiration Date
1/1/1900
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 22-1416 <br /> Change Order No. 1 <br /> Page 3 of 4 <br /> This change order item was initiated at the City's request to enhance both the aesthetic appeal and <br /> functionality of the outdoor space, as well as helping deter vandalism, such as tagging or graffiti, on the <br /> building's walls. <br /> AGREED PRICE: $3,566.20 <br /> 9. Change Order Item#1.9: To compensate the contractor for costs associated with installing <br /> second deadbolt to restroom doors. (PCO#10) <br /> This change order item was initiated at the City's request to enhance the security and safety of the <br /> facility. This modification aligns with the City Parks Department's standard for ensuring that all public <br /> restroom doors are properly secured to prevent unauthorized access, vandalism, or other security <br /> concerns. <br /> AGREED PRICE: $4,857.08 <br /> 10. Change Order Item #1.10: To compensate the contractor for costs associated with additional <br /> painting at pool storage building, CMU wall and replacing damaged facia. (PCO#11) <br /> This change order item was initiated at the City's request to replace fascia board that had suffered <br /> significant deterioration due to weather exposure, age, and lack of maintenance. If left unaddressed, this <br /> could lead to further damage, including water infiltration, which might compromise the roof structure and <br /> cause costly long-term issues. Additionally, the pool storage building and CMU wall had not been painted <br /> in quite some time, which resulted in a buildup of wear from exposure to the elements, including sun, <br /> rain, and temperature fluctuations <br /> AGREED PRICE: $4,891.65 <br /> 11. Change Order item #1.11: To compensate the contractor for costs associated with painting <br /> restroom rose mural. (PC0#12) <br /> This change order item was initiated at the city's request to paint a mural at the restroom building was <br /> made to enhance the aesthetic appeal of the space while also supporting local artists and fostering <br /> community pride.Additionally, this initiative aligns with the city's commitment to supporting the arts and <br /> enhancing public spaces in ways that are both creative and meaningful. <br /> AGREED PRICE: $7,600.00 <br /> TOTAL AGREED PRICE: $35,934.57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.