My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BRIDGEROCK CONSTRUCTION, INC. (EL SALVADOR PARK RESTROOM IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BRIDGEROCK CONSTRUCTION, INC. (EL SALVADOR PARK RESTROOM IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 10:38:23 AM
Creation date
12/12/2024 10:37:54 AM
Metadata
Fields
Template:
Contracts
Company Name
BRIDGEROCK CONSTRUCTION, INC.
Contract #
P23-6035, 22-1416
Agency
Public Works
Expiration Date
1/1/1900
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 22-1416 <br /> Change Order No. 1 <br /> Page 2 of 4 <br /> 3. Change Order Item#1.3: Credit for using restroom existing concrete footings and switching <br /> plumbing materials from cast iron to PVC. (PCO#3) <br /> This change order item was initiated by the City to receive a credit for utilizing existing concrete footings <br /> and switching to plumbing material for cost efficiency and practical considerations. By reusing the existing <br /> concrete footings, the city was able to reduce the need for additional excavation and concrete work. <br /> AGREED PRICE: ($3,500) <br /> 4. Change Order Item #1.4: To compensate the contractor for costs associated with replacing <br /> g p p g <br /> damaged 2x6 ceiling joists. (PCO#5) <br /> This change order item was initiated at the City's request to ensure the structural integrity and safety of <br /> the building. During the course of construction, it was discovered that several ceiling joists were <br /> compromised, either due to prior wear and tear, water damage, or other unforeseen factors. Damaged <br /> joists can lead to compromised load bearing capacity, which could result in ceiling instability or even <br /> structural failure over-time._-__ - - -- -----_ ---_--- <br /> AGREED PRICE: $1,436.73 <br /> i <br /> 5. Change Order Item#1.6: To compensate the contractor for costs associated with adding <br /> additional 2x6 support rafters at roof overhang where damage is visible. (PCO#6) <br /> This change order item was initiated at the City's request to ensure the structural integrity and safety of <br /> the building. During the course of construction, it was discovered that several roof rafters were <br /> compromised, either due to prior wear and tear, water damage, or other unforeseen factors. <br /> AGREED PRICE,: $2,141.96 <br /> G. Change Order Item #1.6: To compensate the contractor for costs associated with priming and <br /> painting restroom building roof and trim. (PCO#7) <br /> This change order item was added at the City's request to protect the long-term integrity of the structure <br /> and to address maintenance concerns. The roof had not been painted in quite some time, which resulted <br /> in a buildup of wear from exposure to the elements, including sun, rain, and temperature fluctuations. <br /> AGREED PRICE: $5,260.56 <br /> 7. Change Order Item#1.7: To compensate the contractor for costs associated to replace facia <br /> board and remove unused conduits. (PCO#8) <br /> This change order item was initiated at the City's request to replace fascia board that had suffered <br /> significant deterioration due to weather exposure, age, and lack of maintenance. If left unaddressed, this <br /> could lead to further damage, including water infiltration, which might compromise the roof structure and <br /> cause costly long-term issues. Additionally, the unused conduits, were no longer serving any purpose, <br /> and removing will enhance the property's overall condition. <br /> AGREED PRICE: $3,880.48 <br /> 8. Change Order Item #1.8: To compensate the contractor for costs associated with planting ficus <br /> creeping pumila stake ripens throughout the landscape. (PCO#9) <br />
The URL can be used to link to this page
Your browser does not support the video tag.