Laserfiche WebLink
<br /> <br /> PSGP Appendix | February 2021 Page G-1 <br />Program Appendix G: <br />Port Security Grant Program (PSGP) <br /> <br />As a reminder, while this appendix contains PSGP-specific information and requirements, the main <br />content of this Manual (non-appendix information) contains important information relevant to all <br />preparedness grant programs, including the PSGP. Please be sure to read the main content of this Manual <br />in addition to the program-specific appendices. <br /> <br />PSGP grant recipients and subrecipients may only use PSGP grant funds for the purposes set forth in the <br />Notice of Funding Opportunity (NOFO), and all investments must be consistent with the statutory <br />authority for the award. These grant funds may not be used for matching funds for other federal awards, <br />lobbying, or intervention in federal regulatory or adjudicatory proceedings. In addition, federal funds may <br />not be used to sue the Federal Government or any other government entity. <br /> <br />PSGP Funding Guidelines <br />Costs charged to a PSGP award must be consistent with the Uniform Administrative Requirements, Cost <br />Principles, and Audit Requirements for Federal Awards, located at 2 C.F.R. Part 200. For more <br />information on 2 C.F.R. Part 200, please visit Information Bulletin (IB) 400 regarding FEMA’s <br />implementation of these provisions prior to the recent 2020 revisions. For information on the recent <br />revisions to these regulations, see 2 CFR Grants Management Policy Updates | FEMA.gov and <br />www.performance.gov/CAP/grants/. <br /> <br />PSGP Priorities <br />See the annual PSGP NOFO. <br /> <br />Limitations on Funding <br />As part of the PSGP application process, applicants must complete the approved Investment Justification <br />(IJ) template provided addressing each initiative being proposed for funding. A separate IJ should be <br />submitted for each proposed project which should represent the complete scope of work and materials <br />required to achieve a single overall capability. For example, a project could be to procure a boat <br />specifically designed and equipped as chemical, biological, radiological, nuclear and explosives <br />(CBRNE) detection, prevention, response, and/or recovery platform. The IJ for this example project <br />should include the CBRNE equipment in the same IJ as the vessel. <br /> <br />In accordance with 46 U.S.C. § 70107(b)(2), PSGP funding for projects for the cost of acquisition, <br />operation, and maintenance of security equipment or facilities to be used for security monitoring and <br />recording, security gates and fencing, marine barriers for designated security zones, security-related <br />lighting systems, remote surveillance, concealed video systems, security vessels, and other security- <br />related infrastructure or equipment that contributes to the overall security of passengers, cargo, or <br />crewmembers cannot exceed $1 million federal share per project. <br /> <br />The $1 million per project limitation applies only to those projects funded under 46 U.S.C. § 70107(b)(2) <br />and does not apply to projects funded under other provisions of Section 70107. <br />