My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relevant Project Experience: <br />■ Sewer Pipe Protection: Mission Blvd/ SR-71 Interchange- City of Pomona, CA: IDS was retained by CH2MHILL <br />(the Prime consultant on the project) to provide structural engineering services to protect the sewer utilities at <br />the site. The existing sewers, due to planned embankments and walls, are to be loaded such that predicted <br />settlement of the sewers may create damage to the existing pipes. The sewers are owned by the County of Los <br />Angeles Sanitation District. As Project Principal, Said oversaw IDS' team for the Plans, Specifications, and <br />Estimate (PS&E) for agency plan check and approval. <br />■ Sewer Line Review, Laguna Royale Condominiums - Laguna Beach, CA: At the base of the Laguna Royale <br />Condominium property, in the soil below Level A, the 78 condominium units are served by a single 8-inch <br />diameter sewer pipe that drops vertically down into the South Coast Water District's (SCWD) sewer tunnel that <br />runs along the coast below this portion of the property. IDS was retained to perform an investigation of the <br />condition and configuration of the sewer lines at Level A, conduct a review of sewer main repairs and prepare <br />preliminary recommendations for sewer main modifications. Scope of work consist of schematic plans showing <br />the proposed modifications to the sewer lines and an opinion of probable cost. Mr. Hilmy was the Project <br />Principal, working the City of Laguna Beach and South Coast Water District to ensure the proposed plans and <br />system modifications adhered to the desired requirements. <br />■ Evaluation of Sanitary Sewer System, Arrowhead Springs 1,916-acre Resort, San Bernardino, CA: IDS was <br />retained by Campus Crusade for Christ International to perform asset assessment study for selected facilities of <br />the Arrowhead Springs Resort in San Bernardino, California. The Sanitary Sewer system consists of gravity <br />collection system for the majority of the site. A duplex wet -well pump system services the lower Village area. <br />The Effluent is directed to a treatment plant consisting of an Imhoff Tank, dosing chamber, trickling filter, <br />clarifier and filter, and absorption beds. Scope of work included an assessment to determine the improvements <br />required to allow the resort to operate as a full -service hotel with an operational village facility. As Project <br />Principal, Said directed our team in the development of a plan to repair / replace the watertight conveyance <br />system. <br />City of Huntington Beach Ranger Sewer Lift Station No. 16, Huntington Beach, CA: As part of overall capital <br />improvement plan, the City of Huntington Department of Public Works Beach has designed and installed several <br />new sewer lift stations to improve service to several of its communities. The existing facility included the <br />construction of a two -compartment concrete enclosure housing subterranean dry pump room and wet well <br />areas. IDS provided comprehensive project management services including daily on -site inspection services. The <br />experience and expertise of the IDS inspector was a key factor in the resolution of many project issues in the <br />area of design, construction means and methods and contract administration. <br />• 1630 W. Recycled Water Pipeline Segment C-Pipe Supports at Flood Control Channel Crossing at Baseline Road <br />and Alta Cuesta Drive, Inland Empire Utility Agency, Chino, CA: IDS provided construction drawings for the 30" <br />recycled pipe crossing for the 1630 West Recycled Water Project Segment C in the City of Rancho Cucamonga. <br />This project was partially funded by a grant from US Bureau of Reclamation with very tight delivery schedule. <br />IDS evaluated the crossing, developed drawings and prepared the necessary calculations for the pipeline <br />crossing at the San Bernardino Flood Control Channel in the City of Rancho Cucamonga. As Project Principal, <br />Said worked with the governing Agency to ensure quality and completion within the required timeframe. <br />ALA IDS CROUP Page 2 <br />ARDURRA B-52 City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.