My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QC review forms will be used to document that <br />internal reviews have been conducted. All <br />comments will be identified with the reviewer's <br />name. When comments are resolved to the <br />satisfaction of the reviewers, the reviewers and <br />our Project Manager will sign off on the review <br />forms. <br />The QA/QC Plan will ensure technical adequacy <br />and QC of work, along with design parameters <br />are translated into planning and design <br />documents. QA/QC will be directed by Mr. Tom <br />Epperson, PE, and led by Mr. Mark Bush, PE, <br />who has more than 27 years of experience. <br />Formal QA/QC reviews are scheduled around <br />project submissions. The review will be <br />completed well ahead of the submission date to <br />allow time to correct potential errors and <br />omissions, including complete subconsultant <br />coordination. In every QA/QC review, a checklist <br />form developed by Tetra Tech for the project is <br />utilized for the review. The reviewer completes <br />the checklist by adding text and makes any <br />additional comments in red on the document. <br />The Project Manager and the QA/QC Manager <br />review the comments for fatal flaws. If none are <br />found, the Project Manager oversees the <br />implementation of the comments by closing <br />each comment on the form with a response and <br />by addressing the changes on the plans by high- <br />lighting the revision. <br />CATEGORY OF SERVICES <br />Tetra Tech will propose on all the category of <br />services except for Construction Inspection. Per <br />the RFP, the following matrix of services is <br />presented: <br />1 Planning, Resources, and Design ✓ <br />(a-e) <br />✓ ✓ <br />2 Construction Management (a_b) (c) Construction <br />Inspection <br />3 Pipeline Design ✓ <br />4 Electrical, Instrumentation and ✓ <br />Control Services <br />5 Geotechnical Engineering Services ✓ <br />TETRA TECH <br />Page115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.