My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ROJAS, ALICIA (5)
Clerk
>
Contracts / Agreements
>
R
>
ROJAS, ALICIA (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 12:43:35 PM
Creation date
1/21/2025 11:02:52 AM
Metadata
Fields
Template:
Contracts
Company Name
ROJAS, ALICIA
Contract #
N-2024-394
Agency
Public Works
Expiration Date
10/31/2025
Insurance Exp Date
1/23/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />ALICIA <br />ROJAS <br />• Website Integration Planning: Work with the city's IT department to plan the <br />integration of 3D tours, digital content, and preservation guidelines into the city <br />website. <br />Month 7-8: Review, Quality Control, and Policy Finalization <br />• Initial Review: Lead the review of the 3D models, digital content, and draft <br />preservation policy, making any necessary adjustments to ensure accuracy and <br />quality. <br />• Beta Testing: Select a few pilot sites to test the QR codes, 3D tours, and how the <br />preservation guidelines might be applied. Gather feedback from city officials, <br />community members, and technical experts. <br />• Policy Finalization: Finalize the preservation guidelines and policies, incorporating <br />feedback from the review process. Prepare for official adoption by the city council <br />or relevant governing body. <br />Month 9-10: Final Content Assembly, Policy Adoption, and QR Code Deployment <br />• Finalize 3D Tours: Complete the final assembly of 3D tours and digital content for <br />all murals and public art. <br />• QR Code Creation: Oversee the generation of QR codes for each site, ensuring <br />they link directly to the corresponding 3D tour, digital archive, and newly <br />established preservation guidelines. <br />• Signage Production: Design and produce signage that includes QR codes, brief <br />descriptions of the artwork, instructions for accessing the 3D tours, and a note on <br />the preservation policy. <br />• Policy Adoption: Present the finalized preservation guidelines and policies to the <br />city council for formal adoption, providing expert testimony and support to ensure <br />smooth passage. <br />Month 11: Installation, Public Launch Preparation, and Policy Rollout <br />• QR Code Installation: Supervise the installation of QR code Signage at each mural <br />and public art site in the parks. <br />Alicia Rojas www.alicia-rojas.com aliciarojasart@Email.com <br />This work plan contains proprietary information belonging to Alicia Rojas and may not be distributed, replicated, or <br />implemented in any way without authorization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.