My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 5:21:15 PM
Creation date
1/21/2025 2:13:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06-12 Marina Beach Water Quality Imp. <br />Award Value: $ 2,399,375.00 Final Contract: $ 2,134,640.02 <br />Progress: 100 % Completion Date: October 2007 <br />Scope: Install new HDPE storm drain to redirect drainage away from public beach. <br />Owner: Los Angeles County Dept. of Public Works <br />Contact: Ali Zadeh, <br />900 So. Fremont Ave, Alhambra, CA 91803-1331 <br />Phone: (626) 458-3144 Phone: <br />07-02 Joint Outfall H, Unit 9B, Steel Pipe Replacement <br />Award Value: $ 68,063.88 Final Contract: $ 68,063.88 <br />Progress: 100 % Completion Date: June 2008 <br />Scope: Emergency repairs to an existing sewer structure. <br />Owner: Sanitation District of Los Angeles County <br />Contact: Tommy Sung, <br />1955 Workman Mill Road, Whittier CA 90607 <br />Phone: (562) 699-7411 Fax: (562) 695-2897 <br />07-04 San Antonio Ave Sewer & Storm Drain <br />Award Value: $ 4,889,250.00 Final Contract: $ 5,184,213.24 <br />Progress: 100 % Completion Date: April 2008 <br />Scope: Furnish and install storm drain facilities within street right-of-way. RCP from 90" to <br />18" and appurtenant structures. <br />Owner: City of Upland <br />Contact: Bob Critchfield, Senior Engineer <br />460 North Euclid Ave., Upland, CA 91786-4732 <br />Phone: (909) 291-2946 <br />08-02 1It" Street Reconstruction <br />Award Value: $ 3,541,345.00 Final Contract: $ 3,910,111.89 <br />Progress: 100% Completion Date: 12/31/2008 <br />Scope: Furnish and install storm drain facilities within street right-of-way. RCP from 90" to <br />18" and appurtenant structures. <br />Owner: City of Upland <br />Contact: Bob Critchfield, Senior Engineer <br />460 North Euclid Ave., Upland, CA 91786-4732 <br />Phone: (909) 291-2946 Fax: (909) 291-2946 <br />
The URL can be used to link to this page
Your browser does not support the video tag.