Laserfiche WebLink
08-04 Storm Drain Modifications at Pomona Water Reclamation Plant <br />Award Value: $ 103,000.00 Final Contract: $ 103,000.00 <br />Orig. Duration: n/a Total Duration: 1 Month <br />Progress: 100 % Completion Date: July 2008 <br />Scope: Reconstruction of an open grate storm drain trough and modification of an existing <br />manhole. <br />Owner: Sanitation Districts of Los Angeles County <br />Contact: Tommy Sung, <br />1955 Workman Mill Road, Whittier CA 90607 <br />Phone: (562) 699-7411 Fax: (562) 695-2897 <br />08-06 Beryl Street Storm Drain Improvements <br />Award Value: $ 3,135,950.00 Final Contract: $ 3,318,379.22 <br />Orig. Duration: 175 Cal Days. Total Duration: 175 <br />Progress: 100 % Completion Date: October 2008 <br />Scope: Construct new storm drain consisting of 90", 72" reinforced concrete pipes, catch <br />basins, manholes, and appurtenant structures. Work included installation within <br />paved traffic lanes, storm water pollution control, water and sewer relocations and <br />landscape and hardscape restorations. <br />Owner: City of Rancho Cucamonga, California <br />Contact: Romeo M. David, Associate Engineer <br />10500 Civic Center Drive, Rancho Cucamonga, CA 91729-0807 <br />Phone: (909) 477-2740 ext. 4070 Fax: (909) 477-2849 <br />08-13 Seven Facilities Storm Drain <br />Award Value: $ 588,339.76 Final Contract: $696,221.33 <br />Orig. Duration: 12 Months Total Duration: 8 months <br />Progress: 100% Completion Date: May 2009 <br />Scope: 2350 cubic yards of debris clean -out in storm drain facilities including the <br />installation of access manholes. <br />Owner: L.A. County Dept of Public Works <br />Contact: Daryl Hamilton <br />900 S. Fremont Ave. Alhambra, CA 91803 <br />Phone: (626) 458-3122 Fax: (626) 458-2197 <br />