My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 5:21:15 PM
Creation date
1/21/2025 2:13:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Bubalo Construction Co., Inc. has the unique ability to perform all of the required <br />elements for a successful and prompt emergency repair "in-house". We have the ability <br />to provide civil engineering tasks that include: <br />Shoring design <br />Utility conduit design <br />Value Engineering <br />Underground structure <br />design <br />CPM Scheduling <br />(Primavera) <br />Dewatering & Bypass <br />Design <br />Quality Assurance Plans <br />Site specific safety plans <br />SWPPP Preparation <br />Traffic Control Detour Plans <br />Hydraulic Calculation <br />In addition to these skills, we have assisted utility owners in liaison coordination and <br />permit review. Emergency repairs that might require participation from agencies outside <br />of the Owner's control will benefit from our experience with various federal, state and <br />local agencies. <br />Site Specific Emergency Response Details: <br />• Storm Water Compliance <br />We have in-house staff qualified and experienced in producing site specific <br />SWPPP's that will ensure compliance with permit conditions. <br />• Shoring <br />We have in-house staff qualified and experienced in producing site specific <br />Shoring plans that will ensure compliance with Cal -OSHA. <br />• Hot -Taps and High -Lines <br />If existing water services must be maintained, the existing water mains can be <br />hot -tapped to connect with the new water mains. The existing water services can <br />be maintained with a temporary above ground supply line (high -lines). <br />• Construction Sequencing <br />Schools — night time work to reduce impact on school traffic flow <br />Traffic Control <br />Whenever possible the staging and alignment of the repairs shall be arranged in <br />such a manner as to minimize impacts to traffic congestion and limit the amount <br />of disruption. We provide in house production of stamped traffic control plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.