My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 5:21:15 PM
Creation date
1/21/2025 2:13:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Utility Conflicts <br />Every effort will be made to locate utilities in advance of construction. We will <br />make every effort to utilize all of the information and coordination resources <br />available with DigAlert-811. <br />Our first order of work will be identifying and contacting all utility owners as soon <br />as practicable. Initiating field meetings to identify conflicts and planned <br />concurrent activities. <br />• Subcontractors <br />MBC self -performs earthwork, bypass pumping, shoring, dewatering, concrete, <br />pipeline assembly, trench installation and equipment procurement and <br />installation. We typically subcontract for rebar fabrication, traffic striping, paving & <br />electrical (SCADA) installation. <br />Mike Bubalo Construction Co., Inc. has a proven record of appropriate business ethics <br />toward subcontractors, including, but not limited to, the following: <br />a. Demonstrated knowledge of and compliance with federal, state and City of <br />Los Angeles laws and regulations pertaining to utilization of subcontractors <br />and business practices toward subcontractors; <br />b. Demonstrated commitment to practices of good faith and fair dealing toward <br />subcontractors; and <br />C. Demonstrated record of satisfactory performance of contractual obligations <br />owing to subcontractors, including timely payment. <br />The following subcontractors have performed satisfactory work on our previous projects: <br />Subcontractor Firm <br />E-nor Innovations <br />Statewide Traffic <br />LnA Concrete <br />All American Asphalt <br />Beard Electric <br />Knowledge of Local Conditions <br />Work Performed <br />Pavement Delineation <br />Traffic Control Maintenance <br />Concrete Structures/Flatwork <br />Asphalt Paving <br />Electrical/SCADA instrumentation <br />Mike Bubalo personnel have extensive first hand experience trenching utilities <br />throughout the entire City of Los Angeles over the past 38 years. Our staff has a working <br />relationship with various local public utilities as well as numerous state and federal <br />authorities. <br />Safety: <br />Overall safety has improved on site over the last two years for our worksites. We have <br />zero (0) hours of lost time reported on OSHA form 300 reports for the last two years and <br />
The URL can be used to link to this page
Your browser does not support the video tag.