My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 5:21:15 PM
Creation date
1/21/2025 2:13:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brad Sorem <br />Education <br />California State Polytechnic University Pomona, CA <br />March 2009 to Pomona <br />December 2013 <br />■ Bachelor of Science, Construction Engineering Technology <br />Work Experience <br />Mike Bubalo Construction Co. Inc. Baldwin Park, CA <br />June 2001 to Present <br />Project Coordinator <br />■ Laborer 2001 to 2005 <br />■ Project Coordinator/Project Manager 2005 to Present: responsible for take offs, estimating, <br />coordination with subcontractors and material suppliers, change orders, submittals, permits, <br />safety, project coordination and management, equipment management, air quality compliance, <br />storm water pollution prevention plans, etc. <br />Protect Experience <br />• Dover Drive Trunk Sewer Relief and Domestic Waterline Relocation — Orange <br />County Sanitation District - 2013 <br />o Project Coordinator - Construct 7,200 LF of VCP sewer and relocate <br />2,400 LF of 8-inch and 6-inch PVC waterline. <br />• Dana Point Town Center Infrastructure Improvements Phase II — South Coast <br />Water District - 2014 <br />o Project Manager — Construct 2,800 LF of 8-inch and 15-inch PVC sewer <br />and 6,500 LF of 8-inch and 10-inch PVC waterline. <br />• Wineville Recycled Waterline Extension Segment B — Inland Empire Utilities <br />Agency - 2014 <br />o Project Coordinator — Construct 12,400 LF of 36-inch CML&C recycled <br />waterline and 9 triple offset butterfly valves. <br />
The URL can be used to link to this page
Your browser does not support the video tag.