Laserfiche WebLink
• Newport Ave. 16-Inch Watermain Valve Installation Project — City of Tustin - <br />2015 <br />o Project Manager — Install three 16-inch gate valves with the use of line <br />stops. <br />• Avenida Palizada Turnout Refurbishment — South Coast Water District - 2015 <br />o Project Manager— Demolish three existing turnout vaults and 10-inch <br />piping and consolidate new turnout and piping into one large vault. <br />• El Camino Real Improvements — Toll Brothers Inc. - 2015 <br />o Project Manager — Construct 5,000 LF of 12-inch recycled waterline, 200 <br />LF of 12-inch potable waterline, 500 LF of 8-inch PVC sewer and 5,200 <br />LF of RCP ranging in size from 12-inches to 48-inches. Also the <br />construction of 34 LF of double 4'x8' RCB and 92 other concrete drainage <br />structures. <br />• Los Cerritos Channel Sub Basin 4 Infiltration - City of Signal Hill — 2016 to 2019 <br />o Assistant Project Manager — Design build project consisting of the <br />construction of 31-acre-foot subterranean storm water infiltration basin, a <br />storm water diversion inlet from the Los Cerritos Channel and two <br />hydrodynamic separators capable of handling a total of 166 cubic feet per <br />second of storm water. <br />• City of Los Angeles Emergency Sewer Repair Program — City of Los Angeles <br />2017 to Present <br />o Project Manager — Oversight of all tasks relating to emergency sewer <br />repairs within the City of Los Angeles. <br />• City of Los Angeles Emergency Storm Drain Repair Program — City of Los <br />Angeles 2017 to Present <br />o Project Manager — Oversight of all tasks relating to emergency storm drain <br />repairs within the City of Los Angeles. <br />