Laserfiche WebLink
Oscar Camarena, Foreman <br />2005 to Present Mike Bubalo Construction Co., Inc. <br />1989 to 2005 Precision Pipeline <br />Duties: Set up and coordinate public works projects. Oversee the installation of water <br />lines, sewer lines, and recycled water lines. Potable water lines installed were from 8 to <br />48 inches in diameter. Installation of copper house connections, blow off assemblies, air <br />vacuum assemblies and fire hydrants. Installation of valves includes inline gate valves, <br />butterfly valves, check valves, cathodic protection and pressure reducing valves in <br />various sizes. Also have completed hydrostatic testing, chlorination of potable water <br />lines and worked with microbiology laboratories. Recycled water lines installed were <br />from 8 to 60 inches in diameter. Completed the retrofitting and upgrading of existing and <br />new pump stations. <br />Agencies Worked For: Inland Empire Utilities Agency, Eastern Municipal Water District, <br />Central Basin Municipal Water District, City of Seal Beach, City of Anaheim Public <br />Utilities Department, City of Chino Public Works, Los Angeles County Sanitation District, <br />City of Glendora Water Division, City of Covina Public Works, City of Pico Rivera Water <br />Division, City of Ontario Public Works, City of Montclair Public Works and Upper San <br />Gabriel Valley Municipal Water District. <br />