Laserfiche WebLink
John Sarna <br />2010 to Present - Mike Bubalo Construction Co., Inc. <br />Upper San Gabriel Valley Municipal Water District — City of Industry Phase IIB Recycled <br />Waterline <br />Inland Empire Utilities Agency — Turner Basin 16 inch Reclaimed Waterline Extension <br />Foothill Transit — Parking Structure Fire Line Extension <br />2006 to 2009 — Surf City Construction <br />Desert Water Authority - 12 inch Mainline Extension and Hydrant Installations <br />Coachella Valley Water — 16 inch Mainline Extension and Hydrant Installations <br />Longs Drug — Fire Line Installations <br />Indio Water — Fantasy Springs 12 inch Bypass and Mainline <br />1998 to 2006 — JMS Excavating and Grading <br />Arizona Water Co. — Various watermain, hydrants and service connections installed as <br />well as booster pumpstations. <br />Kachina Village Improvement District - Various watermain, hydrants and service <br />connections installed and repairs to existing mainlines. <br />Munds Park Water Co. - Various watermain, hydrants and service connections installed. <br />Prescott Valley Water Co. - Various watermain, hydrants and service connections <br />installed. <br />Williamson Valley Water - Various watermain, hydrants and service connections <br />installed. <br />City of Phoenix - Various watermain, hydrants and service connections installed and <br />booster pumpstation upgrades. <br />1996 to 1998 — Peter Kiewit <br />Pulliam Airport Waterline Improvements — 12 inch mainline with hydrants and service <br />connections. <br />1982 to 1996 — MMW Equipment Rentals <br />Various Utility Projects <br />