Laserfiche WebLink
<br />CITY OF SANTA ANA <br />Preparer: <br />Reviewer: <br />Project No.: <br />Date Revised: <br />Date Reviewed: <br />10/17/24 <br />COST ESTIMATE <br />S CRODDY WAY (Full Depth AC 7.5") <br />Item Mesa Water District City of Santa Ana <br />No. NO.DESCRIPTION UNIT Unit Price Quantity <br />2,100 <br />3,570 <br />35 <br />Cost Quantity Cost <br />1 <br />2 <br />3 <br />4 <br />Unclassified Excavation CY <br />TN <br />EA <br />EA <br />$ <br />$ <br />$ <br />$ <br />288.00 <br />218.00 <br />$ <br />$ <br />$ <br />$ <br />604,800.00 <br />778,300.00 <br />59,500.00 <br />1,850.00 <br />900 <br />1,800 <br />0 <br />$ 259,200.00 <br />$ 392,400.00Asphalt Concrete (T=7.5") <br />Adjust Water Valve Frame and Cover <br />Adjust Manhole Frame and Cover <br />1,700.00 <br />1,850.00 <br />$- <br />1 7 $13,000.00 <br />SUBTOTAL CONSTRUCTION COST $ 1,444,450.00 $ 664,600.00 <br />Design Engineering 10% <br />10% <br />15% <br />$ <br />$ <br />$ <br />144,000.00 <br />144,000.00 <br />217,000.00 <br />$66,000.00 <br />Contingency $66,000.00 <br />Construction Engineering <br />TOTAL PROJECT COST <br />$ 100,000.00 <br />$ 1,949,000.00 $ 897,000.00 <br />10/17/2024