My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> f. System Verification at Completion <br /> a. OTDR Testing <br /> Once the passive cabling system has been installed and is ready for <br /> activation, 100 percent of the fiber links shall be tested with the OTDR for <br /> attenuation. Test results shall be recorded, dated, compared and filed with <br /> previous copies. Copies of traces and test results shall be submitted to the <br /> Engineer for approval. If the OTDR test results are unsatisfactory the link <br /> shall be replaced at the Contractor's expense. The new link shall then be <br /> tested to demonstrate acceptability. Copies of the test results shall be <br /> submitted to the Engineer for approval. <br /> b. Test Failures <br /> If during any of these system verification tests, the results prove to be <br /> unsatisfactory, the fiber optic cable and or defective splice enclosures will <br /> not be accepted. The unsatisfactory components shall be replaced at the <br /> Contractor's expense. The new segment of cable shall undergo the same <br /> testing procedure to determine acceptability. Copies of the test results shall <br /> be submitted to the Engineer for approval. The removal and replacement <br /> of a segment of cable shall be interpreted as the removal and replacement <br /> of a single contiguous length of cable connecting two splices, two <br /> connectors, or a splice and a connector. The removal of only the small <br /> section containing the failure and therefore introducing new unplanned <br /> splices will not be allowed. <br /> 4.33 CLOSED CIRCUIT TELEVISION(CCTV) SYSTEM <br /> When CCTV system is required, the Contractor shall furnish and install Axis Q6315-LE <br /> PTZ Network Camera as shown on the plan. The CCTV system shall consist of <br /> camera/pan-tilt assembly, mounting, cables, conductors and wires, control software and <br /> video management system licensing. <br /> 1. Mounting <br /> The Contractor shall mount the integrated camera/position unit on existing traffic signal <br /> pole as shown on plans and per manufacturer's recommendation. The Contractor shall <br /> verify the mounting requirements of the integrated camera/position unit, and the <br /> suitability of the approach depicted in these plans. The Contractor may request <br /> approval for alternate mounting details by submitting a shop drawing signed by a <br /> registered Engineer. <br /> 2. Video Cable <br /> The Contractor shall furnish and install manufacturer recommended Outdoor CAT-6 <br /> Ethernet cable with IP66-rated connectors and incidental hardware from the camera to <br /> 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.