My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> an Ethernet switch in the cabinet to establish circuit continuity. The cable shall be <br /> installed without damaging the conductors, dielectric or jacket. The cable assembly <br /> shall not be kinked or bent tighter than the Manufacturer's recommended bending <br /> radius. <br /> 3. Testing <br /> The Contractor shall test and document the installation and operation of all material, <br /> equipment, cables and connectors for continuity, shorts or grounds. The Contractor <br /> shall also carry out system integration testing to ensure that the video interface and <br /> camera interconnect wiring performs to the specified standards when used in operation <br /> with all other devices installed under the contract. <br /> 4. Warranty <br /> The Contractor shall provide a warranty for all equipment installed or modified under <br /> these projects for the extended warranty period provided by the manufacturer. The <br /> warranty shall be 12 months from the time the Agency accepts the Project. The <br /> warranty on all parts and equipment used on these projects shall be provided by the <br /> manufacturer or agent of the equipment. The Contractor shall provide,at no cost to the <br /> Agency,all labor,materials,testing, and equipment required restoring the system to its <br /> fully operational condition. Following this warranty period,the Contractor shall assign <br /> to the Agency the balance of the manufacturer's warrantees or guarantees on all <br /> electrical and mechanical equipment of the system. <br /> 4.34 IP COMMUNICATION SYSTEM <br /> When required by the plan, the contractor shall supply and install necessary equipment to <br /> establish communication via IP addressing between the City Advanced Traffic <br /> Management System(ATMS) and existing field devices or field devices being installed. <br /> - Etherwan Hardened-Managed Fiber Optic Ethernet Switch—EX78934X-OVB w/Hardened <br /> Power Supply(Quantity= 1) <br /> - Etherwan Hardened 1 G BASE SFP Fiber Transceiver—SFPGIS20M(Quantity=4) <br /> - Corning Cable Systems Closet Connector Housing CCH-01U(Quantity=2) <br /> - Corning Splice Tray(Quantity=2) <br /> - Corning SC Duplex Connector Panel—CCH-CP12-59(Quantity=2) <br /> - Fiber Optic Patch Cord—duplex,single-mode—SC to LC connectors—3 meters (Quantity= <br /> 4) <br /> - CAT-5 Patch Cord-2 meters (Quantity=4) <br /> 4.35 PAYMENT <br /> Payment for any items of work required by the plans, the specifications or other reference <br /> documents that are not covered by a contract bid item shall be considered as included in <br /> other bid items. <br /> 83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.