Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> downstream) of the location. The operator immediately shall notify the Contractor. Then, <br /> the Contractor shall notify the Engineer. <br /> CCTV inspections shall be delivered in an electronic format (DVD/USB drive) to the <br /> Engineer for review and approval. <br /> A.All Pipe Assessment & Certification Program (PACP) header information shall be <br /> completed in accordance with the PACP Guidelines. <br /> B.The documentation for the work shall consist of CCTV reports, database, logs, <br /> electronic reports,etc.noting important features during the inspection. The above <br /> documentation must be submitted to the City. The speed of travel during the inspection <br /> shall not exceed at any time more than 30 feet per minute, except noted otherwise. <br /> C.Tho camera must be centered to provide accurate distance measurements and locations <br /> of features in the sewer main. All observations shall be displayed and documented on <br /> video and identified by audio on PACP log. All video must be continuously metered <br /> from the manhole. <br /> D.All lengths of installed sewer main and sewer laterals shall be documented by footage <br /> or stationing in the video. Sewer laterals shall be videoed up to the property line. The <br /> pipe shall be clean to ensure all defects and observations are logged and documented. <br /> E. During inspection, the operating technician shall, in addition to his/her video (with <br /> audio) record of conditions, log in writing the location of all laterals, defects, <br /> misalignments, and other conditions and data pertinent to the physical condition and <br /> operation of the sewer main and sewer laterals. <br /> Cleaning of the sewer main and laterals shall include removal of debris or foreign objects <br /> introduced during construction. Such debris shall be vacuumed from the system and shall <br /> not be washed or otherwise deposited downstream. Cleaning apparatus shall be removed <br /> prior to insertion of the video camera. Under no circumstances shall cleaning apparatus be <br /> used in direct conjunction with video operations. <br /> Under no circumstances will plugging and/or bypassing be permitted without prior <br /> approval and presence of the Engineer. If plugging and/or bypassing are deemed <br /> necessary, the Contractor shall be responsible for plugging manhole outlets and/or <br /> providing a bypass line for the effluent during videotaping. The sewer mains will be "in <br /> service" at the time of the video inspection. <br /> If the video is of poor quality and not suitable for review, the Contractor shall re-video the <br /> line and resubmit to the City. <br /> The video technician shall hold a current National Association of Sewer Service <br /> Companies (NASSCO) certification. Provide operator certification to the engineer for <br /> review and approval. <br /> 106 <br />