My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> New submittals shall be required for material substitutions. The Engineer shall review and <br /> upon approval notify the Contractor by a memorandum. <br /> During construction, the Contractor shall make provisions for the collection of sewage <br /> from cutoff laterals. All sewer laterals shall be reconnected to the main before the <br /> termination of each working day. <br /> The curb and gutter shall be protected in place. If the Contractor damages curb, gutter, it <br /> shall be removed and replaced to match existing in accordance with City of Santa Ana <br /> Standard Plan No. 1101. This work shall also include removal and replacement of PCC <br /> sidewalk,driveway panels and landscaping to facilitate construction of sewer laterals.PCC <br /> sidewalk and driveway approach panels shall be replaced to match existing in accordance <br /> with the City of Santa Ana Standard Plan No. 1104 and 1112. Sidewalk replacement shall <br /> be from score line to score line, unless the sidewalk panels exceed four feet in length. At <br /> no time, shall a sidewalk panel floater be less than four feet from the nearest score line. <br /> Landscaping shall be replaced in-kind. <br /> 6.17 CONNECT SEWER LATERALS <br /> This work shall include reconnecting existing sewer lateral to the new sewer main. This <br /> work shall include locating all existing laterals and pipe connection points, furnishing and <br /> installing new pipe and connections to the new main in accordance with City of Santa Ana <br /> Standard Plan Nos. 1204 and 1204A, replacement of street surface over trench as shown <br /> on drawings. <br /> At all locations where more than one (1) lateral serves a single parcel, Contractor shall <br /> expose existing lateral connection to the existing sewer main and verify that the lateral is <br /> active by CCTV inspection. In addition, the Contractor shall insert a push camera with <br /> sounder/locator up the lateral from the main(insertion pit) to mark and locate the point of <br /> connection at the property line. If CCTV investigation is inconclusive, lateral shall be <br /> treated as active and shall be constructed per plan.If lateral is determined to be dead,lateral <br /> shall be plugged and abandoned in place. <br /> During construction, the Contractor shall make provisions for the collection of sewage <br /> from cutoff laterals. All sewer laterals shall be reconnected to the main before the <br /> termination of each working day. <br /> 6.18 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER MAIN AND <br /> LATERALS <br /> Following installation of pipe, CCTV inspection shall be performed on all newly <br /> constructed sewer mains and sewer laterals. This work shall also include cleaning of sewer <br /> main prior to videoing in accordance with section 500-1.1.4 of the Standard Specifications. <br /> The scope of work includes the cleaning and videoing by means of remote CCTV. If a <br /> blockage in the pipe hampers the CCTV work, then the Contractor shall attempt to <br /> complete the CCTV work by televising from the opposite manhole (upstream or <br /> 105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.