Laserfiche WebLink
CITY OF SANTA ANA <br /> DEFINITION OF BID ITEMS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> Bid Item No. 3 - Install 3" PVC Conduit <br /> This work consists of furnishing installing Polyvinylchloride (PVC) traffic signal and/or <br /> interconnect communication conduit including pull tape, ground wire, fittings, duct seal, pot <br /> holing, concrete or asphalt restoration and appurtenances complete and in place, of the size <br /> indicated on the plans. <br /> Payment for the installation of 3"PVC Conduit shall be at contract unit price bid per Linear Foot <br /> listed in the Bid Proposal and shall be considered full compensation for furnishing all labor, <br /> materials, tools, equipment, removals, paving, landscape repair, sidewalk restoration, pothole, <br /> and/or trench backfill per City Std. Plan 1150, permanent asphalt replacement, permanent PCC <br /> replacement,striping and appurtenances for all related items of work necessary for the installation, <br /> and no additional compensation will be allowed therefore. <br /> Bid Item No.4- Install 4" PVC Conduit <br /> This work consists of furnishing installing Polyvinylchloride (PVC) traffic signal and/or <br /> interconnect communication conduit including pull tape, ground wire, fittings, duct seal, pot <br /> holing, concrete or asphalt restoration and appurtenances complete and in place, of the size <br /> indicated on the plans. <br /> Payment for the installation of 4"PVC Conduit shall be at contract unit price bid per Linear Foot <br /> listed in the Bid Proposal and shall be considered full compensation for furnishing all labor, <br /> materials, tools, equipment, removals, paving, landscape repair, sidewalk restoration, pothole, <br /> and/or trench backfill per City Std. Plan 1150, permanent asphalt replacement, permanent PCC <br /> replacement,striping and appurtenances for all related items of work necessary for the installation, <br /> and no additional compensation will be allowed therefore. <br /> Bid Item No. 5 - Install SCE Pull Box <br /> This work consists of installing and/or replacing pull box per SCE design plan, including the <br /> removal and/or modification of any interfering portions of existing pull boxes, conduit, PCC, <br /> concrete, and asphalt restoration, as indicated on plans. <br /> Payment for the Installation of SCE Pull Box, shall be at contract unit price bid per Each Item <br /> listed in the Bid Proposal and shall be considered full compensation of furnishing all labor, <br /> materials, tools, equipment, removals, paving, landscape, repair, sidewalk restoration, and <br /> appurtenances for all related items of work necessary for the installation and no additional <br /> compensation will be allowed therefore. <br /> Bid Item No. 6- Install No. 6 Pull Box <br /> This work consists of installing and/or replacing pull boxes including bolt down Fiberlyte Lid per <br /> City Std. Plan 1501 with bolts, the removal and/or modification of any interfering portions of <br /> existing pull boxes, conduit, PCC, concrete, and asphalt restoration, as indicated on plans. <br /> 2of8 <br />