My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FCS INTERNATIONAL, INC.
Clerk
>
Contracts / Agreements
>
F
>
FCS INTERNATIONAL, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 5:12:28 PM
Creation date
2/5/2025 5:12:27 PM
Metadata
Fields
Template:
Contracts
Company Name
FCS INTERNATIONAL, INC.
Contract #
A-2023-194-18A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
1/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRSTCARBON F'raposal <br /> SOLUTIONS <br /> FCS INTERNATIONAL,INC. <br /> identified, FCS will draft mitigation measures that would reduce the impact to a less than significant <br /> level. <br /> The following issues will be evaluated in the Administrative Draft IS/MND: <br /> O Aesthetics •> Mineral Resources <br /> ® Agriculture and Forestry Resources Noise <br /> m Air Quality Population and Housing <br /> o Biological Resources 5 Public Services <br /> m Cultural Resources , Recreation <br /> ® Energy Transportation <br /> 9 Geology and Soils 0 Tribal Cultural Resources <br /> © GHG Emissions ' Utilities and Service Systems <br /> o Hazards and Hazardous Materials s Wildfire <br /> • Hydrology and Water Quality 0 Mandatory Findings of Significance <br /> O Land Use and Planning <br /> Each Environmental Checklist impact category will consider applicable local regulations and guidelines, <br /> as appropriate, including the General Plan and General Plan EIR. <br /> Deliverable <br /> Q Electronic copy(via email/Dropbox in Microsoft Word) of the Administrative Draft IS/MND to the <br /> City. <br /> Assumption <br /> e If an incremental submittal and/or expedited submittal is requested,then a change order will be <br /> submitted. <br /> a Additionally, FCS assumes that all documents will be prepared in the FCS style template. Should <br /> the City request a different template to be used,then a separate Scope of Work will be prepared. <br /> Task 5: Preparation of Public Review Draft IS/MND <br /> This Scope of Work assumes the City will coordinate review with the applicant team and will provide one <br /> set of consolidated,vetted comments(with tracked changes in the Word document)on the Screencheck <br /> Draft IS/MND. Following receipt of any comments on the Screencheck Draft IS/MND, FCS will complete <br /> revisions and prepare the Draft IS/MND.This Scope of Work assumes the City will distribute copies of <br /> the Draft IS/MND to responsible agencies and the public for a 30-day public review period. FCS will post <br /> the Draft IS/MND, NOC,and Summary Form to the State Clearinghouse's online portal,CEQAnet,to <br /> formally commence the 30-day review period.This Scope of Work assumes that the City will be <br /> responsible for local distribution and noticing, including,but not limited to, newspaper noticing or radius <br /> mailing. <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 8 <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.