My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
71-053
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1971
>
71-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2015 3:15:06 PM
Creation date
6/26/2003 10:46:45 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
71-53
Date
6/7/1971
Document Relationships
72-111
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUT]LIC WORKS STANDARD REOUIREM]~NTS <br /> <br />Prio? to the Issus~ce o~ a Buildinq Permit <br /> <br />Submit to Lho Department of Public Works, for..the.$r approval, <br />an acceptable final grading plan or an 'on-site drainag~ plan <br />or both, she%ring the dir~:ction and means of flow to tile <br />adjacent street(s) or channel(s) when this property is <br />developed. Plan zs to include existing and proposed eleva- <br />tions at the property lines. Applicants should check with <br />the Department of Public Works for extent of study needs. <br /> <br />2. Submit a sanitary sewer study to the Department of Public Works. <br /> <br />Submit to the Department of Public Works a runoff|study based <br />on a storm of a ten-year* frequency to show exist$ng and <br />proposed facilities and methods of draining this Site and <br />tributary areas without exceeding the capacity ofiany street, <br />on-site or off-site. , <br /> <br />*twenty-five for sump condition <br /> <br />Submit an on-site water system study and plan to ~he Depart- <br />ment of Public Works. <br /> <br />5. Dedicate required street or alley right of way. <br /> <br />6. Provide a ten-year continuing offer of dedication[for required <br /> street right of way. <br /> <br />7. Dedicate vehicular access rights. <br /> <br />8. Provide construction plans for: <br /> <br />a. required street improvement,~ <br /> sewer system, <br />c. storm drain system, <br /> water system, <br />e. other. <br /> <br />9. Reserved. <br /> <br />10. Pay drainage assessment fee. <br /> <br />11. Pay City sanitary sewer main assessment fee. <br /> <br />-"1'2. Pay special sewer agreement reimbursement fee. <br /> <br />13. pBy Sanitation District No. 7 fee. <br /> <br />14. Pay City water main charges. <br /> <br />15. Pay water service connection charges. <br /> <br />16. Pay street lighting deposit for future <br /> <br />17. Pay street tree charges. <br /> <br />street lights. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.