My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
74-126
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1974
>
74-126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:35:05 PM
Creation date
6/26/2003 10:46:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
74-126
Date
8/19/1974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35. <br /> <br />~i~{ODOLOGY <br /> <br />This project will be conducted as a cooperative effort by the Santa <br />Aha Police Department and representatives of the law enforcement <br />ccmmunity in Orange County. Not only is this approach necessary and <br />appropriate in order to develop and clarify program data needs, but <br />it also will help to ensure that the expansion of the Burglary Pre- <br />vention Data System is designed to be practical, operational and not <br />overbu_rdensome in its requirements for the recording and entering of <br />raw data into the system by the user agencies. <br /> <br />The effort outlined below constitutes a mult-phased program to ex- <br />pand the hardware configuration to accommodate the new requirements, <br />select proper remote terminals and communications methods, implement <br />enhancements to the system, continue previous functions of the system <br />and project appropriate long-raz~e modifications to the system to pro- <br />vide the optimum in information processing for the region. <br /> <br />Phase I will be the analysis, definition, review of the expansion re- <br />quirements and operational specifications aqcording to. established <br />regional performance criteria and standards. Phase II will consist of <br />hardware specifications, procurement of equipment and preliminary sys~tem <br />modifications. Phase III will consist of system implementation, oper- <br />ation and post-implementation review. To.ensure accomplishment of the <br />technical and administrative coordination requirements of the project, <br />a permanent Advisory Committ'ee will be established. The Advisory Committee <br />will be comprised of representatives from all participating law enforce- <br />ment agencies in O~ange County, and will provide a formal vehicle for <br /> <br />- 19 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.