Laserfiche WebLink
Bid acceptance <br />Fire alarm cable <br /> <br />Bids <br />Rotary type air <br />compressor .~ <br /> <br />Bid acceptance <br />Power street <br />sweeper <br /> <br />Bid acceptance <br />Wheel type tractor <br />shovel t~%~ <br /> <br />George A. Wise <br /> <br />Variance <br />Elnoran, Inc. <br /> <br />Variance <br />Mrs. C.R.Barker <br /> <br /> A tabulation of bids was presented by the Manager for the furnishihg of fire alarm <br /> cable, in accordance with Specification No. 634-3.1, as follows: <br /> <br /> United States Rubber Company Total price $7,207.30 <br /> California Wholesale Electric Co. Total price $8,131.54 <br /> The Okonite Company Total price $8,258.75 <br /> <br /> On recommendation of the Manager and on motion of Councilman Markel, seconded by <br /> Heinly and carried, the bid of United States Rubber Company, at the total price <br /> of $7,207.30 was accepted and all other bids rejected. <br /> <br /> On recommendation of the Manager and on motion of Councilman Jerome, seconded by <br /> DeAl and carried, the committee was granted two weeks time in which to reconsider <br /> the bids received on the furnishing of the rotary type air compressor. <br /> <br /> A tabulation of bids was presented by the Manager for the furnishil~ of a power <br /> street sweeper, in accordance with Specification No. 624-3, as follows: <br /> <br /> Brown-Bevis-Industrial Equilmnent Company Net cost $11,058.00 <br /> DeliVery guaranteed 90 days after receipt of order. <br /> <br /> A.M.Donaher & Son Net cost $11,840.00 <br /> Delivery guaranteed 60 days after receipt of order. <br /> <br /> On recommendation of the ~4~nager and on motion of Councilman Dahl, seconded by <br /> Jerome and carried, the bid of Brown-Bevis-Industrial Equipment Company at a net <br /> cost of $11,058.00 was accepted and the other bid rejected. <br /> <br />A tabulation of bids was Presented ~y the Manager for the furnishing of aw heel <br />tYPe tractor shovel, in accordance with Specification No. 623-8, as follows: <br /> <br />Smith Booth Usher Company Net cost $12,714.40 <br />Guaranteed delivery 1/2 day after receipt of order. <br /> <br />Casey-Metcalf Machinery Company Net cost $12,863.00 <br />Guaranteed delivery l0 days by truck after receipt of order, <br />or 21 days by rail. <br /> <br />Calavar Corporation Net cost $12,694.00 <br />Guaranteed delivery 30 to 60 days after receipt of order. <br /> <br />Essick Machinery Company Net cost $ 8,660.76 <br />Guaranteed delivery l0 days after receipt of order. <br /> <br />Brewn-Bevis-Industrial Equipment Co. Net cost $13,450.00 <br />Guaranteed delivery 30 days after receipt of order. <br /> <br />On recommendation of the Manager and on motion of Councilman Dahl, seconded by <br />Jerome and carried, the bid of Smith Booth Usher Company-at a net cost of $12,714.1 <br />was aece~ as the best and~owest bid and all other bids rejected. <br /> <br />On motion of Councilman D~hl, seconded by M~zrkel and carried, the recommendation of <br />the Planning Commission was approved and the variance of George A. Wise granted to <br />permit the use of property located on the east side of Cypress Avenue, Just south <br />of the ~1] ey between Central Avenue and Adams Street, for location of a tilt-up, <br />one-story, pre-fab concrete ~ireproof building, to be used for machine shop and <br />welding work and for storage of materials, waiving the usual setback requirements <br />subject to the conditions as imposed by the Commission. <br /> <br />On motion of Councilman I~h], seconded by Jerome and carried, the recommendation o <br />the Planning Commission was approved and the variance of Elnoran, Inc. granted to <br />permit the use of property located at the southwest corner of Fairview Avenue and <br />Bristol Street, for the develol~nent of a shopping center to include supermarket, <br />drug and variety stores, etc.,subject to conditions as imposed by the Commission <br />and the Department of Public Works. <br /> <br />On motion of Councilman Dahl, seconded by Jerome and carried, the recommendation of <br />the Planning Commission was approved and the variance of Mrs. C. R. Barker granted <br />to permit the addition of a car port to existing four-car garag~-e and construction <br />of an apartment over the garage, on property at 816 East Chestnut Avenue, subject <br /> <br /> <br />