Laserfiche WebLink
O77 <br /> <br />078 <br /> <br />079 <br /> <br />O80 <br /> <br />081 <br /> <br />082 <br /> <br />083 <br /> <br />O84 <br /> <br />085 <br /> <br />O86 <br /> <br />O87 <br /> <br />O88 <br /> <br />O89 <br /> <br />O9O <br /> <br />091 <br /> <br />092 <br /> <br />093 <br /> <br />094 <br /> <br />O95 <br /> <br />096 <br /> <br />097 <br /> <br />098 <br /> <br />099 <br /> <br />agency. <br /> <br />(c) <br /> <br />(d) <br /> <br /> of a draft EIR, if the local agency desires~ If <br /> information is provided in the form of a draft EIR, <br /> the p~blic agency may not use the draft EIR as its <br /> own without independent evaluation and analysis. <br /> The draft EIR which is sent out for public review <br /> <br /> must reflect the independent judgment of the public <br />The public agency should require an appli- <br /> <br /> cant to specify to the best of his knowledge'which <br /> other public agencies will have jurisdiction by <br /> law epp~ev~-~h~ty over the project. <br /> <br /> The EIR may be prepared ~ ~ separate document, or <br /> as a part of a p~oject report. If prepared as a <br /> part of the project r~port, it must still contain <br /> in one separate and distinguishable section the <br /> elements required of an EIR, including the seven <br /> elements specified in Article IV, Section 4 of <br /> these rules and regulations. <br /> <br /> All Public and private activities or undertakings <br /> pursuant to or in furtherance of a redevelopment <br /> plan constitute a single project, which shall be <br /> deemed approved.at the time of. the adOption of the <br /> redevelopment plan b~ the Santa Ana City council. <br /> The EIR in connection with'the redevelopment plan <br /> <br />-46- <br /> <br /> <br />