Laserfiche WebLink
148 <br /> <br />149 <br /> <br />150 <br /> <br />151 <br /> <br />152 <br /> <br />153 <br /> <br />154 <br /> <br />155 <br /> <br />156 <br /> <br />157 <br /> <br />158 <br /> <br />159 <br /> <br />160 <br /> <br />161 <br /> <br />162 <br /> <br />163 <br /> <br />164 <br /> <br />16.5 <br /> <br />166 <br /> <br />167 <br /> <br />168 <br /> <br />169 <br /> <br />171 <br /> <br />SECTION 4. <br /> <br />SECTION 5. <br /> <br />propounded by the <br /> <br />A~encY as amended from time to time~ <br /> <br />Subsequent EIR. Where an EIR has been prepared, <br />additional EIR need by prepared unless: <br /> <br />(a) <br /> <br />Secretary of the State Resources <br /> <br />no <br /> <br /> Substantial changes are proposed in the project <br /> which will require major revisions of the EIR, <br /> due to the involvement of new environmental <br /> impacts not considered in a previous EIR on <br /> the project; <br /> <br /> (b) There are substantiai changes with respect to <br /> the circumstances under which the project is <br /> to be undertaken, such asa change in the <br /> proposed locafion of the project, which <br /> will require major revisions in the EIR <br /> due to the involvement of the new environ- <br /> mental impacts not covered in a previous EIR. <br /> <br />Use of A single EIR. The Environmen.tal Impact <br />Evaluator may employ a single EIR to describemore <br />than one project, as such projects are essentially <br />the same in terms of environmental impact. Further, <br />the Environmental Impact Evaluator may use an <br />earlier EIR prepared in connection with an earlier <br />project t° apply to a later project, if the Cir- <br />cumstan6es of the projects are essentially the same. <br /> <br />-49- <br /> <br /> <br />