Laserfiche WebLink
GAM Holding Corporation <br /> <br />2. Area Description: <br /> <br />A. Property: <br /> <br />The subject property is 438' x 305' containing approximately 133,590 <br />square feet and is located on the southwest corner of Flower and <br />Seventeenth Streets. <br /> <br />B. Surrounding Development: <br /> <br />North: <br />South: <br />East: <br />West: <br /> <br />commercial <br />single family residence and vacant property <br />commercial and apartments <br />church <br /> <br />C. Street System: <br /> <br />Seventeenth and Flower Streets are both planned arterial highways. <br /> <br />D. Comparable Applications or Circumstances: <br /> <br />VA 377 permitted construction of Market Basket on subject site. <br />VA 66-106 permitted addition of a drug store (16,000 square feet) to <br />Market Basket site (never constructed), <br /> <br />E. Surrounding Zoning: See attached SDM. <br /> <br />F. Present Use: Vacant Market Basket building totaling 26,960 square feet. <br /> <br />3. General Plan Compatibility: <br /> <br />The adopted General Plan designates the area as a Special Study Corridor. <br /> <br />4. Evaluation of Proposal: <br /> <br />The applicant proposes to construct a self-service gas station and a drive-up <br />photo booth on an existing shopping center site. The primary uses (refur- <br />bishment of existing facility and gas station), if considered separately, <br />would not necessitate a variance application inasmuch as the location of the <br />gas station is located in the C 1 District permitting gas station, and the <br />refurbishment is not a modification of the original variance. However, the <br />original variance considered the parcel in total and any modification thereto <br />(addition of drive-up booth and gas station) requires the submittal of a new <br />variance. <br /> <br />The property as it presently exists with a vacant food market building and <br />expansive parking area is beginning to deteriorate. The proposal would re- <br />furbish the exterior of the building and add much needed landscaping along <br />the perimeter of the property and interior parking area. With respect to <br />the amount of parking existing versus that which is proposed (from 243 to 135), <br />the total amount still exceeds that amount required for the uses (108 required). <br /> <br />The applicant proposes to phase development of the property. Phase I would <br />complete the realignment and landscaping of the parking area and perimeter <br />landscaping along Seventeenth and the construction of the self-service gas <br />station. Phase II would complete the proposal by refurbishing the existing <br />building and realign and landscape the remainder of the parking area. Staff <br />has reviewed this proposed phasing and cannot concur with the phasing develop- <br />ment of this project. It is felt that all landscaping and parking area re- <br />alignment and public improvements should be completed at one time. The <br />development is proposed with a continuous theme with the existing building <br />remaining as the primary use and, therefore, should be developed at one time <br />rather than phasing the development. <br /> <br />VA 75-53 Page 2 <br /> <br /> <br />