Laserfiche WebLink
RESOLUTION NO. 77-SS <br />PAGE SIX <br /> <br />STREET WORK PERMITS: <br /> Pemit Issuance Fee (Charged <br /> in Addition to Other Fees) <br /> Trench Excavation & Backfill, <br /> Unless Included in Other Fees: <br /> In Dirt <br /> In Paving <br /> Sewer Mains, Water Mains, Stom <br /> Drains, Culverts & Lined Channels, <br /> Including Earthwork: <br /> In Dirt <br /> In Paving <br /> Sewer Laterals & Water Services, <br /> Including Earthwork <br /> Manholes, Vaults, Catch Basins, & <br /> Junction Chambers, Including <br /> Earthwork <br /> Curb, Gutter, or Combination Curb & <br /> Gutter, Including Earthwork <br /> Curb Return, Including Earthwork <br /> Sidewalk & Driveway, Including <br /> Earthwork <br /> Paving, Including Earthwork <br /> Fencing, Including Earthwork: <br /> Masonry, Concrete or Block <br /> Other <br /> Storage of Materials in Maintained <br /> Street Right-of-Way <br /> Other Work Not Covered in Schedule <br /> Above <br /> <br />Refmdable Deposit (Cash or Bond) <br /> Posted with Each Pemit Application <br /> <br />TRACT MAP - FINAL <br /> <br />TRANSPORTATION PERMITS FOR <br />OVERSIZE OR OVERWEIGHT VEHICLES <br /> <br />SECTION IX: <br /> <br /> RECREATION AND PARKS: <br /> <br /> ARTS & CRAFTS - Teen <br /> <br /> BASKETBAJ_L Men's <br /> Men's Three-Man Basketball <br /> Women's <br /> <br /> CAKE DECORATING CLASSES <br /> CAMP-DAY (5 DAYS) <br /> <br />DANCE CLASSES <br /> Children's <br /> Round (Contractual) <br /> <br />Each <br /> <br />Linear Foot <br />Linear Foot <br /> <br />Linear Foot <br />Linear Foot <br /> <br />Each <br /> <br /> Each <br /> <br />Linear Foot <br />Each <br /> <br />Square Foot <br />Square Foot <br /> <br />Linear Foot <br />Linear Foot <br /> <br /> Location <br /> Project <br /> <br /> Pemi t <br /> <br /> Eng. Check Fee <br />Plus Ea. Lot or Parcel <br /> <br /> Annual Pemit <br />Single Trip Pemit <br /> <br />10 Lessons <br /> <br />Team <br />Team <br />Team <br /> <br />l0 Lessons <br /> <br />1 Week - 1 Person <br /> 2nd Person <br /> 3rd/Family <br /> <br />8 Lessons <br />16 Weeks <br /> <br />5.75 <br /> <br />0.03 <br />0.06 <br /> <br />0.17 <br />0.23 <br /> <br />4.60 <br /> <br />15.00 <br /> <br /> 0.09 <br /> 4.60 <br /> <br /> 0.02 <br /> O.O1 <br /> <br /> 0.11 <br /> 0.06 <br /> <br /> 3.50 <br /> <br /> 2% of <br />Construction Cost <br />or at City's Cost <br /> Plus Overhead at <br /> City' s Option <br /> <br />50.00 <br /> <br />50.00 <br /> 3.00 <br /> <br />25.00 <br /> 5.00 <br /> <br />10.00 <br /> <br />155.00 <br /> 25.00 <br />155.00 <br /> <br />15.00 <br /> <br />lO.O0 <br /> 7.50 <br /> 5.00 <br /> <br /> 7.50 <br />1.25/Week <br /> <br /> <br />