/426
<br />
<br /> Council Chamber
<br /> Santa Aha City Hall
<br /> April 18, 1960 7:30 P.M.
<br />
<br /> City Council met in reg,]ar session.
<br /> Meeting called to order by the Mayor.
<br />
<br /> Present: Councilmen Royal E. Hubbard, Stanley C. Gould, Jr.,
<br /> Dale H. Heinly, Bob Brewer, A. A. Hall
<br />
<br /> Absent: Councilmen None
<br />
<br /> The Pledge of Allegiance ~*as given.
<br />
<br /> Invocation was given by Reverend Lloyd Munger, First Baptist Church of Santa Aha.
<br />
<br /> Each member of the City Council having received copies of the Minutes of April ~,
<br /> 1960 and April 6, 1960, reading of the Minutes was dispensed with and approved on
<br /> motion of Councilman Hubbard, seconded by Gould and carried.
<br />
<br /> Bid On recommendation of the Manager, and on motion of Councilman Heinly, seconded by
<br /> Power Stump Cutter
<br /> ~ ~ ? ~ ~ubbard and carried, action was postponed to May 2, 1960, on the award of the bid
<br />
<br /> fora Power Stump Cutter, Specification 652-7.
<br />
<br /> Bid acceptance A tabulation of bids was presented for the widening of North Main Street, between
<br /> Widening North Main
<br /> St.,Part V of Pro- 7th and 15th Streets, Part V, PrOjeCt NO. 102~ and for the reSurfac~ug of lhth
<br /> ject No.102; and
<br /> Resurfacing 12th St., Street, between Main and Bush Streets, Project No. C-23, as follows:
<br /> Project No. C-43. , , Total Bond
<br /> ~ ~ ~ Cox Bros. Construction Co. $87,568.30 10~
<br /> Griffith Company 89,327.00 $10,000.00
<br /> Sully-Miller Contracting Cc~apany 81,225.00 10~
<br />
<br /> motion
<br /> of Councilman Gould, seconded by Hubbard and carried, the lowest and bes~l
<br />
<br /> bid of Sully-Miller Contracting Company, in the total amount of $81,225.00, was
<br />
<br /> accepted, and all other bids rejected.
<br />
<br /> Bid acceptance A tabulation of bids was presented for the widening of First Street, between Town-
<br /> Widening First St.,
<br /> Project No.]10; and send Street and the Santa Aha River, Project No. llO; and for the improvement of
<br /> Improvement Fairview
<br /> St.,Project No.ll3. Fairview Street, between First and Fifth Streets, Project No. ll3, as follows:
<br /> Total Bond
<br /> Goode & Schroeder, Inc. $9~,272.60 10~
<br /> Griffith Corporation 71, ~32.00 $8,000.00
<br /> Sully-Miller Contracting Company 8~,905.00 10~
<br /> Cox Bros. Construction Co. 85,570.50 10%
<br /> B. J. Noble Company 85,380.OO lO~
<br /> On motion of Councilman Gould, seconded by Hubbard and carried, the lowest and bes{i
<br /> bid of Griffith Corporation, in the total amount of $71~432.00, was accepted, and
<br /> all other bids rejected.
<br />
<br />i~{earings This being the date set for hearing to establish future right-of-way lines on the
<br />i~stablish future following streets:
<br />i.~/w lines on (cc) Edin~er Street
<br />'.~dinger St., First St .- On both sides between Harbor Boulevard and a point approximstely h79 feet
<br />~olsa Ave., and Dyer Rd. west of the centerline of Fairriew Street, measured 52 feet north and south of and
<br />Drdinance parallel to the survey center line of Edinger Street.
<br /> ~ /~ On both sides.between a point ~79 feet west of the center line of Fairview
<br /> Street and a point 211 feet east of the center line of Gordon Place, measured 52
<br /> feet north and south of and parsllel to the construction center line of Edinger
<br /> Street.
<br /> On both sides between a point 211 feet east of the center line of Gordon
<br /> Place and Raitt Street, measured 52 feet north and south of and parallel to the
<br /> survey center line of Edlnger Street.
<br /> On the north side between Rattt Street and Bristol Street, measured ~0 feet
<br /> from and at right angles to the survey center line of Edinger Street.
<br /> On the south side between Raitt Street and Bristol Street, measured 52 feet
<br /> south of and parallel to the survey center line of F~tinger Street.
<br /> On the north side between Bristol Street and Magnolia Street, measured hO
<br /> feet from and at right angles to the survey center line of Edinger Street.
<br /> On the south side between Bristol Street and a point lb5 feet east of the
<br /> center line of Baker Street, measured 52 feet from and at right angles to the surv~
<br /> center line of Edinger Street.
<br /> On the north side between Sycamore Street and a point 196 feet east of the
<br /> 'center line of Main Street, measured 72 feet from and at right angles to the surve~
<br /> center line of ~dinger Street.
<br /> On th~ south side between Sycamore Street and a point 153 feet east of the
<br /> center line of Main Street, measured 30 feet from and at right angles to the surve~
<br /> center line of Edinger Street.
<br />
<br />(dd) First Street - Bolsa Avenue
<br /> On both sides between the west corporate limits and Harbor Boulevard, measur~
<br />60 feet north and south of and parallel to the survey center line of Bolsa Avenue.i
<br />
<br />
<br />
|