Laserfiche WebLink
T.B. Penick & Sons, Inc. January 9, 2025 <br />Santa Ana Zoo Improvements Project- Lithocrete/Lithomosaic Page 2 of 3 <br />SITE CONCRETE <br />Site Concrete Terms & Conditions: <br />1. CONCRETE PRICES: The concrete material pricing is based on all known concrete material cost <br />increases thru 06/30/2025. Any increases beyond this date will be billed as an extra to the base bid on <br />the actual material cost increases from our suppliers. (Backup letters from suppliers will be <br />provided.) These extra costs will be based on the actual material left to be shipped to the job. <br />2. BID DAY ISSUES: This proposal is valid for 30 days. T.B. Penick & Sons, Inc. is a non -union, non - <br />MBE company. Prevailing wage rates included. Waivers of Subrogation, Broad Form and Type I <br />Indemnification at a rate of 1 % is not included in this price. T.B. Penick & Sons is unable to offer a <br />Waivers of Subrogation, Broad Form or Type I Indemnification on projects under $50,000.00. Price <br />based on Project No. 22-2764 Santa Ana Zoo Walkways Improvements -Phase 1, 14 Sheets Rebid #2 <br />set. <br />3. CONTRACT ISSUES: If a contract between the General Contractor and TBP has not been fully <br />executed prior to the start of any work, then this proposal in its entirely shall become the Agreement <br />and only Agreement between the General. Contractor and TBP. Builder's Risk insurance to be <br />provided by contractor or owner. Work performed on a Time & Material basis will be issued a change <br />order within 30 days of T.B. Penick invoice. Provision of safe legal concrete washout area to be <br />provided by others. T.B. Penick may elect not to perform any work outside of TBP's scope described <br />herein <br />4. PAYMENT TERMS: 1) T.B. Penick & Sons will submit monthly progress invoices (an invoice <br />upon completion). Payment is due upon receipt of invoice. 2) All sums not paid after 45 days when <br />due, shall bear interest at the rate of 1 1/2% interest per month or the maximum legal rate permitted by <br />law, whichever is less. 3) For all sums not paid within 30 days of completion of work by T.B. Penick <br />& Sons, Inc., T.B. Penick & Sons, Inc. shall be entitled to all costs relating to unpaid sums including <br />collection costs and attorneys' fees <br />5. MOVE -INS: One move in to complete all work. Additional move -ins will be charged at $4,500 each. <br />6. WORKING HOURS: All work to be performed during normal working hours. Requested overtime, <br />weekend or shift work will be charged at cost plus 15%. <br />7. STAKING REQUIREMENTS: Staking (furnished by others) for site concrete to be as follows: <br />Sidewalk/Pavin: corner, ridgelines and flow lines. <br />8. WARRANTY: A one (1) year warranty will be issued upon completion of the T.B. Penick & Sons' <br />work. Warranty is contingent upon using recommended products and following T.B. Penick & Sons, <br />Inc.'s maintenance manual. Failure to comply with the T.B. Penick & Sons maintenance manual will <br />result in warranty becoming null and void. Cracks are inherent in all concrete products, T.B. Penick <br />& Sons does not warrantee against cracks. <br />9. EFFLORESCENCE: Efflorescence are deposits of water soluble mineral such as salt on the concrete <br />surface. Efflorescence is a naturally occurring phenomenon inherent with all concrete products. T.B. <br />Penick does not warranty against the appearance of efflorescence or against their affects on any sealer <br />applied to the concrete surface. <br />10. SUBGRADE CONDITIONS: Subgrade for flatwork to be provided by others to within. P to balance <br />and at compaction. In the case of retaining walls the subgrade is to be left by others to within .l' of <br />the lowest adjacent finish subgrade for the entire width of the footing. Rough grading by others to <br />provide proper clearance for forms. <br />11. CONCRETE SEALER: T.B. Penick & Sons protects our concrete with a clear sealer. This sealer <br />needs to be maintained periodically as it is worn off the surface. The need for this maintenance <br />coating will be greater in heavy traffic areas or in areas that are frequently or aggressively cleaned. <br />Refer to your T.B. Penick & Sons maintenance manual for recommended procedures. Concrete <br />sealers can fail at hydrostatic pressure greater than 5 pounds per 1000 square feet per 24 hours. The <br />end user shall determine the suitability of all sealers or concrete coatings for the intended use and <br />assumes all risks and liability in connection therewith. <br />3 INNOVATIVE CONCRETE SYSTEMS • LITHOCRETE • SrF + oomANITE + NTMA TERRAZZO • GRASSCRETE 09 <br />r. <br />