My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
84-009
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1984
>
84-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:32:56 PM
Creation date
6/26/2003 10:46:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
84-9
Date
1/16/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Remove sidewalk at the intersection of Rush Street and <br /> Sixteenth Street and construct sidewalk spandrel and <br /> wheelchair access ramp. <br /> <br /> 3. Construct curb gutter and sidewalk frc~ Rush Street to <br /> the easterly edge of the existing <br /> <br />4. Construct two driveway spproaches per city standard to be <br /> approved by the Department of Transportation Services. <br /> <br />5. Remove existing parkway trees and plant new trees per city <br /> standards. <br /> <br />6. If necessary, relocate existing street light per city <br /> standards. <br /> <br />Bush Street <br /> <br /> Remove existing driveway approach and close with curb, gutter <br /> and sidewalk. <br /> <br /> Remove and reconstruct damaged curb and gutter. <br /> <br /> Construct driveway approach per city standards to be approved <br /> by the Department of Transportation Services. <br /> <br /> Install ornamental street light with underground distribution <br /> as required by the Department of Transportation Services. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.