Laserfiche WebLink
2. Remove sidewalk at the intersection of Rush Street and <br /> Sixteenth Street and construct sidewalk spandrel and <br /> wheelchair access ramp. <br /> <br /> 3. Construct curb gutter and sidewalk frc~ Rush Street to <br /> the easterly edge of the existing <br /> <br />4. Construct two driveway spproaches per city standard to be <br /> approved by the Department of Transportation Services. <br /> <br />5. Remove existing parkway trees and plant new trees per city <br /> standards. <br /> <br />6. If necessary, relocate existing street light per city <br /> standards. <br /> <br />Bush Street <br /> <br /> Remove existing driveway approach and close with curb, gutter <br /> and sidewalk. <br /> <br /> Remove and reconstruct damaged curb and gutter. <br /> <br /> Construct driveway approach per city standards to be approved <br /> by the Department of Transportation Services. <br /> <br /> Install ornamental street light with underground distribution <br /> as required by the Department of Transportation Services. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br /> <br />