My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
88-011
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1988
>
88-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:32:19 PM
Creation date
6/26/2003 10:46:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
88-11
Date
2/16/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 'B' <br /> <br />Probable Environmen~a~ E£fects. of the Proposed Action <br /> <br /> Please provide a narrative explanation of the probable <br /> environmental ef£ects occurring in each of the following <br /> 41 areas of importance: <br /> <br />Describe the property that will be directly affected <br />by the construction. Is it in a rural, urban or <br />suburban area? Is it directly associated with <br />current facilities operated by the applicant? <br />Please describe the specific piece o£ land upon <br />which the construction will occur in terms of its <br />current use by man. If the land is in a natural <br />state, please provide a brief description with <br />~espect to plant and animal life. <br /> <br />o urban <br />o yes <br />o regional park <br />o raw land with no animal <br /> <br />and wineral plant life <br /> <br />Describe the surrounding area. It is primarily <br />residential, industrial, agricultural, etc. Has <br />the area been formally zoned for specific uses. <br />Please provide a map of the immediate area covering <br />approximately one square wile. (Street maps or <br />line drawings for urban projects are sufficient). <br /> <br />Immediately south is industrial; imnediately north <br />and east is park; west is a large river; one half <br />mile north and east is residential. <br /> <br />Mill the construction occur in a flood plain, <br />wetland area, desert, tundra, or some other type of <br />unique geological/meterological interest. <br /> <br />Flood plain until completion of Santa Ana River <br />project. <br /> <br />~ill existing underground service systems (sewage, <br />water, telephone cables, etc.) require more than <br />alterations associated with routine connections or <br />hook-ups? I£ so, please describe. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.