Laserfiche WebLink
ATTACHbtENT "B" <br />Page 2 <br /> <br />Please describe the composition of the sub-surface <br />area. Are there mineral deposits? (Applicable only <br />for all new complexes as well as new facilities in <br />rural and suburban areas). <br /> <br />Sandy silt; no minerals known. <br /> <br />Will the facility obtain water from a natural <br />source, such as wells, rivers, lakes, catchment <br />basins, etc.? <br /> <br />Not directly. <br /> <br />How high will the facility be from ground level? <br />Are there any aircraft approach or departure pat- <br />terns, TV or radio transmission facilities within <br />three horizontal miles o£ the facility? If so, <br />please describe. <br /> <br />Two story with five story tower; no. <br /> <br />Describe any new air pollution sources that will be <br />introduced as part of the facility (heating, cooling, <br />incineration, etc.) together with the emission rates <br />expected. Provide the percent increase of emissions <br />from the usage of existing sources. Please classify <br />such sources as to short-term (construction) and <br />long-term (operation) and describe methods for mini- <br />mizing such effects if such remedies are known. <br /> <br />None. <br /> <br />Approximately how many vehicles will be introduced <br />into the area on a daily basis as a result of the <br />operation of the facility? What is the approximate <br />percentage increase in daily traffic in the area? <br /> <br />Fifty vehicles daily on average; 100% increase, _ <br />however, traffic is currently negligible. <br /> <br /> <br />