Laserfiche WebLink
ATTACHMENT "B" <br />Page 4 <br /> <br />16. <br /> <br />To what extent will the facility alter existing Wind <br />patterns (generally applicable only in rural areas <br />or highly developed urban areas when a wind tunnel <br />would be created or the current wind velocity <br />increased considerably). <br /> <br />None. <br /> <br />17. <br /> <br />During the operation of the facility, will any <br />materials be recycled and/or be discarded which <br />could reasonably be recycled? If so, please <br />describe, <br /> <br />N/A <br /> <br />18. <br /> <br />Will contaminants be stored at tile facility? If <br />please describe physical safeguards that will be <br />used to guard against their introduction to the <br />natural environment should they be accidentally <br />released (fuel oil, large amounts of chemicals, <br />etc. ). <br /> <br />No. <br /> <br />19. <br /> <br />Approximately how many people now live in the <br />immediate area? How many people can be expected <br />live in the immediate area as a result of the <br />operation of the facility (or complex)? <br /> <br />None; none. <br /> <br />to <br /> <br />20. <br /> <br />Approximately how many temporary residents will <br />introduced to the area during construction? <br />(Generally applicable only to rural projects). <br /> <br />N/A <br /> <br />be <br /> <br />21. <br /> <br />Approximately how many temporary residents will <br />normally be associated with the operation of the <br />facility (or complex). <br /> <br />10 15 during working hours. <br /> <br /> <br />