Laserfiche WebLink
ATTACHMENT "B" <br />Page 5 <br /> <br />140. Iq <br /> <br />22. <br /> <br />Approximately how many additional transients will be <br />introduced to the area on a daily basis during <br />operation (ex: staff, students, etc.). <br /> <br />20 - SO/day. <br /> <br />25. <br /> <br />If the project will use agricultural land, parks, <br />woods, forests, prairies, etc., list the types of <br />animals that currently inhabit the area. Generally <br />describe the site in terms of flora which will be <br />destroyed or altered. <br /> <br />No animals, cleared raw land. <br /> <br />24. <br /> <br />~ill the construction of the facility disrupt any of <br />the following services to a human population for more <br />than 24 hours? ~ater, electrical power, natural gas, <br />or sewage. <br /> <br />No~ <br /> <br />25. <br /> <br />How much electricity will the facility (complex) <br />utilize (peak load)? Provide the name and address <br />of the source supplying the electricity. <br /> <br />The Southern California Edison Company (Brand Avenue, <br />south of McFadden) will be the electricity supplier. <br />So. Cal. Edison estimates that at peak load the fac- <br />ility will utilize about 38,000 - 40,000 kwh/month. <br /> <br />26. <br /> <br />How much water will the facility (complex) use on a <br />normal day? What is the system that provides the <br />water (name and address of system). What is the <br />immediate source (reservoir, pumping station, water <br />tower, etc.)? <br /> <br />At peak operations, the facility will use 100 gpm <br />maximum; City of Santa Ana, a 12" water main runs <br />through Centennial Park; city wells and reservoir. <br /> <br /> <br />