Laserfiche WebLink
270 <br /> <br />Jmprove Warner Avenue as follows: <br /> <br />Construct a wheelchair ramp at the <br />northveat corner o£ #arner and Otis <br />Avenue and repair sections of cracked and <br />broken sidewalk and curb In this area. <br /> <br />II. <br /> <br />Construct a new drive approach per City <br />Standard #ll2C <br /> <br />III. <br /> <br />Construct the continuation of the <br />sidewalk at the northeast corner of <br />Harbor Boulevard and Warner Avenue for <br />the full curb return area including <br />construction of a wheelchair ra~p at the <br />corner. <br /> <br />IV. <br /> <br />Construct six street tree wells and plant <br />minimum 24-Inch box tree per City <br />Standard 1124 at locations in accordance <br />with approved improvement plan. <br /> <br />Furnish ornamental street tree lighting <br />vith underground service or as directed <br />by the City Engineer. <br /> <br />II. <br /> <br />Improve Harbor Boulevard as follows: <br /> <br />I. Construct a full width sidewalk on Harbor <br /> Boulevard from the end of the curb return <br /> at Warner Avenue north approximately 40 <br /> feet to 50 feet to accommodate the <br /> O.C.T.D. bus stop at this location. <br /> <br /> Close the existing drive approach by <br /> construction of an A.C. curb to match the <br /> existing curb line and remove all A.C. <br /> paving behind the curb within the public <br /> right-of-way. Landscape the area to ,.. <br /> match existing. <br /> <br />EXHIBIT A <br /> <br /> <br />