Laserfiche WebLink
EXHIBIT A <br /> <br />PROJECT IDENTIFICATION <br />SEWER CONNECTION FEE <br /> <br />NO. PROJECT <br /> <br />pROJECT DESCRIPTION <br /> <br />1 <br /> <br />2 <br /> <br />San Lorenzo Pump Station <br /> <br />Maxine Pump Station & <br />& Connecting Sewer <br /> <br />3 Reserve for Emergency <br /> Repair <br /> <br />4 Highland Street: <br /> Bristol to Flower <br /> <br />5 Richland Street: <br /> Bristol to Flower <br /> <br />6 Cubbon Street: <br /> Bristol to Shelton <br /> <br />7 Walnut Street: <br /> Baker to Flower <br /> <br />8 Pine Street: <br /> Baker to Flower <br /> <br />9 Memory Lane: <br /> Arnett to Flower <br /> <br />10 Baker Street: <br /> 1st to Chestnut <br /> <br />11 Chestnut Street: <br /> Halladay to Standard <br /> <br /> 12 Alley between 3rd & 4th Street: <br /> Main to Bush <br /> <br />13 Sullivan Street: <br /> 1st to 5th Streets <br /> <br /> 14 Fifth Street: <br /> Sullivan to 200" E/O Hawley <br /> <br />Upgrade Pump Station <br />Sewage Capacity <br /> <br />Upgrade Pump Station <br />& convert force main <br />to gravity line <br /> <br />Emergency repair of <br />sewer lines <br /> <br />Upgrade 6" sewer line <br />to 8" sewer line <br /> <br />Upgrade 6" sewer line <br />to 8" sewer line <br /> <br />Upgrade 6" line to <br />8" line <br /> <br />Upgrade 6" line to <br />8" line <br /> <br />Upgrade 6" line to <br />8" line <br /> <br />Upgrade 15" line to <br />18" line <br /> <br />Upgrade 12" line to <br />15" line <br /> <br />Upgrade 6" line to <br />8" line <br /> <br />Upgrade 6" line to <br />8" line <br /> <br />Upgrade 8" line to <br />10" line <br /> <br />Construct 10" Sewer <br />line <br /> <br /> <br />